9824 Spirehaven Ln
Dallas, TX 75238
Residential remodel adds a bonus room at 9824 Spirehaven Ln
City of Dallas permits indicate a residential remodel adding a bonus room above the living room, along with plumbing, mechanical and electrical work. The filings were issued from January 6 through January 21, 2026.
Summarized from City of Dallas records · updated Jan 21, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jan 21, 2026
- since Jan 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Dallas
Questions about 9824 Spirehaven Ln
What is being built at 9824 Spirehaven Ln?
City permits describe a residential remodel that adds a bonus room above the living room, plus related plumbing, mechanical and electrical work.
Is 9824 Spirehaven Ln a new restaurant?
The records provided are residential permits, including an addition and home-system work. They do not identify a restaurant project.
When were permits filed for work at 9824 Spirehaven Ln?
The five City of Dallas permit records span January 6 to January 21, 2026.
What does the addition permit cover at 9824 Spirehaven Ln?
Permit RES-ALT-ADD-25-001456, dated January 6, 2026, describes adding a flooring system to create an extra bonus room above the living room.
What other work is permitted at 9824 Spirehaven Ln?
The permits include electrical work for an additional room, changes to air returns and supply vents, and plumbing for a half bathroom on the second floor. The electrical permit is dated January 18; the mechanical and plumbing permits are dated January 20 and 21, 2026.
Also being built nearby
All of 75238- 9003 Prominence DrJun 2, 2025M/b install 2.5 ton complete gas system r32 freon · 22 m away
- 9016 Prominence DrJul 2, 202550 gallon gas water heater · 25 m away
- 9812 Spirehaven LnOct 13, 20255 ton system replacement - downstairs system · 33 m away
- 9827 Lanshire DrOct 28, 2025Full under slab sewer pipe replacementexcavation to, re-route / replace(hall bathroom, masterbathroom, kitchen & washer line under home sewer pipes only) ofthe plumbing sewer drainpipe under the home only. our planreroutes the under-slab/home sewer pipe and connects it back intothe yard sewer line at the city tap area , effectively replacing the yardsewer line as well, see diagram for tie in location · 100 m away
- 9832 Lanshire DrMay 12, 2026Full under pier & beam sewer pipe replacementexcavation to, re-route / replace see diagram (hall bathroom, masterbathroom, kitchen & washer line under home sewer pipes only) ofthe plumbing sewer drainpipe under the home only. our planreroutes the under-slab/home sewer pipe and connects it back intothe yard sewer line at the city tap area , effectively replacing the yardsewer line as well · 105 m away
- 9907 Lanshire DrAug 4, 2026Repair gas leak on yard service · 115 m away
- 9919 Spirehaven LnOct 30, 2020Install water heater · 118 m away
- 9911 Lanshire DrApr 7, 2026Partial under slab sewer pipe replacement - hallbathroom, master bathroom, a/c condensationdrain & the yard sewer line onlyexcavation to, re-route / replace see diagram (hall bathroom, masterbathroom & a/c condensation drain in front flower bed line underhome sewer pipes only) of the plumbing sewer drainpipe under thehome only. our plan reroutes the under-slab/home sewer pipe andconnects it back into the yard sewer line at the city tap area ,effectively replacing the yard sewer line as well · 120 m away
- 9809 Lanshire DrAug 4, 2026Replace sewer line · 120 m away
- 9814 Lanshire DrAug 13, 2026Gas relay replacement · 123 m away
- 9915 Lanshire DrSep 28, 20262.5 ton coil condenser replacement · 125 m away
- 9924 Spirehaven LnDec 16, 202550 gallon gas water heater · 128 m away
More restaurants in 75238.