9919 Spirehaven Ln
Dallas, TX 75238
9919 Spirehaven Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 9919 Spirehaven Ln, Dallas, TX 75238. The most recent, filed October 30, 2020, covers: “Install water heater”.
Compiled from City of Dallas records · updated Oct 30, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 30, 2020
- since Oct 30, 2020
- Largest scope
- —
- Listed value
- $1
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 9919 Spirehaven Ln
What is being built at 9919 Spirehaven Ln?
The latest filing (City of Dallas permit 2010303033, October 30, 2020) covers install water heater.
How many permits and filings does 9919 Spirehaven Ln have?
1 filing across 1 project, from October 30, 2020 to October 30, 2020.
How much is the construction at 9919 Spirehaven Ln worth?
Permits at this address list about $1 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 9919 Spirehaven Ln?
Yes. Nearby filings include 9924 Spirehaven Ln (50 gallon gas water heater, Dec 16, 2025); 9915 Lanshire Dr (2.5 ton coil condenser replacement, Sep 28, 2026); 9911 Lanshire Dr (partial under slab sewer pipe replacement - hallbathroom, master bathroom, a/c condensationdrain & the yard sewer line onlyexcavation to, re-route / replace see diagram (hall bathroom, masterbathroom & a/c condensation drain in front flower bed line underhome sewer pipes only) of the plumbing sewer drainpipe under thehome only. our plan reroutes the under-slab/home sewer pipe andconnects it back into the yard sewer line at the city tap area ,effectively replacing the yard sewer line as well, Apr 7, 2026).
How do I get alerts for new permits at 9919 Spirehaven Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 9924 Spirehaven LnDec 16, 202550 gallon gas water heater · 16 m away
- 9915 Lanshire DrSep 28, 20262.5 ton coil condenser replacement · 97 m away
- 9911 Lanshire DrApr 7, 2026Partial under slab sewer pipe replacement - hallbathroom, master bathroom, a/c condensationdrain & the yard sewer line onlyexcavation to, re-route / replace see diagram (hall bathroom, masterbathroom & a/c condensation drain in front flower bed line underhome sewer pipes only) of the plumbing sewer drainpipe under thehome only. our plan reroutes the under-slab/home sewer pipe andconnects it back into the yard sewer line at the city tap area ,effectively replacing the yard sewer line as well · 99 m away
- 9907 Lanshire DrAug 4, 2026Repair gas leak on yard service · 102 m away
- 9931 Capridge DrSep 24, 2020Remove existing roof and install new roof · 104 m away
- 9910 Lanshire DrSep 17, 2025Remove old shingles and replace roof · 111 m away
- 9824 Spirehaven LnJan 21, 2026Adding plumbing for a half bathroom on the 2nd floor · 118 m away
- 9951 Capridge DrOct 27, 2020Remove existing roof and install new roof · 120 m away
- 9016 Prominence DrJul 2, 202550 gallon gas water heater · 122 m away
- 9003 Prominence DrJun 2, 2025M/b install 2.5 ton complete gas system r32 freon · 134 m away
- 9004 Fenchurch RdSep 18, 2026This is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve · 150 m away
- 9008 Fenchurch RdOct 23, 2020Remove existing roof and install new roof · 150 m away