9004 Fenchurch Rd
Dallas, TX 75238
Water main replacement permitted at 9004 Fenchurch Rd
A City of Dallas plumbing permit indicates the water main from the city meter to the house will be replaced, with new connections, a whole-house shutoff valve and a double-check valve. The permit was filed September 18, 2026, under permit RES-PLM-26-009952.
Summarized from City of Dallas records · updated Sep 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 18, 2026
- since Sep 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectThis is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve
This is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 9004 Fenchurch Rd
What work is planned at 9004 Fenchurch Rd?
A plumbing permit indicates the water main from the city meter to the house will be replaced, along with its connections, a whole-house shutoff valve and a double-check valve.
When was the plumbing work at 9004 Fenchurch Rd permitted?
The City of Dallas permit was filed September 18, 2026.
What is the permit number for 9004 Fenchurch Rd?
The permit number is RES-PLM-26-009952. It is listed as a residential plumbing permit.
Is a new house being built at 9004 Fenchurch Rd?
The available permit describes replacement of the water main and related plumbing components. It does not describe construction of a new house.
Who issued the permit for 9004 Fenchurch Rd?
The permit record is from the City of Dallas and was filed September 18, 2026.
Also being built nearby
All of 75238- 9008 Fenchurch RdOct 23, 2020Remove existing roof and install new roof · 0 m away
- 9020 Fenchurch RdMay 5, 2026Install 50 gallon gas water heater in attic (swap out) · 1 m away
- 9018 Aldwick DrJul 16, 20254-ton gas level 1 complete (r-454b)complete system replacement · 109 m away
- 9951 Capridge DrOct 27, 2020Remove existing roof and install new roof · 111 m away
- 9031 Aldwick DrDec 9, 2025Remove all cast iron sewer underneath pier and beam home and replace it with schedule 40 pvc and 50-foot trench to replace the main sewer line · 114 m away
- 8917 Fenchurch RdJul 1, 2026Replacing all sewer under home up to the city · 114 m away
- 8924 Aldwick CirMay 27, 2026Gas test · 118 m away
- 8914 Fenchurch RdOct 27, 2025Sewer relay · 119 m away
- 8928 Aldwick CirAug 19, 2026Meter release · 122 m away
- 8910 Fenchurch RdOct 6, 2026Qualifications 1. relocate master bathroom drains in slab per plan with city inspection. provide 38' sq ft of cement demolition & patch. cap existing below slab as needed. 2. relocate existing pex water piping as needed as master bath & working pantry. install master tub iso valves under sink for mixing valve. 3. install shower pan liner with cement preslope and two total valves with two heads at master shower. water test pan for inspection. 4. install plumbing for new master closet washer and new utility room with sink and washer on 2nd floor with air hammer arrestors per code. 5. rework existing washer in working pantry for new sink with dishwasher. air hammer arrestor in wall at top out phase. test above slab. 6. any work additional to qualifications or plumbing scope is billed as additional at t&m rate · 124 m away
- 9931 Capridge DrSep 24, 2020Remove existing roof and install new roof · 129 m away
- 8905 Fenchurch RdMay 13, 2026Install natural gas line for standby generator · 129 m away