Water heater replacement permitted at 9020 Fenchurch Rd
City of Dallas records show a permit for a 50-gallon gas water heater replacement at this residence, filed May 5, 2026. An earlier permit, filed April 8, 2020, covers removing and replacing the roof.
Summarized from City of Dallas records · updated May 5, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 5, 2026
- since May 5, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 9020 Fenchurch Rd
What is being built at 9020 Fenchurch Rd?
City records list home improvement work: a gas water heater replacement in 2026 and a roof replacement in 2020. They do not indicate a new building.
Is a new water heater being installed at 9020 Fenchurch Rd?
A City of Dallas residential plumbing permit describes swapping out a 50-gallon gas water heater in the attic. It was filed May 5, 2026, under permit RES-PLM-26-004672.
When was the water heater permit filed for 9020 Fenchurch Rd?
The permit was filed May 5, 2026. The description says it covers a 50-gallon gas water heater swap-out.
Was the roof replaced at 9020 Fenchurch Rd?
A City of Dallas building permit filed April 8, 2020, describes removing the existing roof and installing a new one. The permit number is 2004086002.
Is a new house being built at 9020 Fenchurch Rd?
The records provided list a water heater replacement and roof replacement at the address, not a permit for a new house.
Also being built nearby
All of 75238- 9008 Fenchurch RdOct 23, 2020Remove existing roof and install new roof · 1 m away
- 9004 Fenchurch RdSep 18, 2026This is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve · 1 m away
- 9018 Aldwick DrJul 16, 20254-ton gas level 1 complete (r-454b)complete system replacement · 109 m away
- 9951 Capridge DrOct 27, 2020Remove existing roof and install new roof · 111 m away
- 9031 Aldwick DrDec 9, 2025Remove all cast iron sewer underneath pier and beam home and replace it with schedule 40 pvc and 50-foot trench to replace the main sewer line · 113 m away
- 8917 Fenchurch RdJul 1, 2026Replacing all sewer under home up to the city · 115 m away
- 8924 Aldwick CirMay 27, 2026Gas test · 118 m away
- 8914 Fenchurch RdOct 27, 2025Sewer relay · 120 m away
- 8928 Aldwick CirAug 19, 2026Meter release · 122 m away
- 8910 Fenchurch RdOct 6, 2026Qualifications 1. relocate master bathroom drains in slab per plan with city inspection. provide 38' sq ft of cement demolition & patch. cap existing below slab as needed. 2. relocate existing pex water piping as needed as master bath & working pantry. install master tub iso valves under sink for mixing valve. 3. install shower pan liner with cement preslope and two total valves with two heads at master shower. water test pan for inspection. 4. install plumbing for new master closet washer and new utility room with sink and washer on 2nd floor with air hammer arrestors per code. 5. rework existing washer in working pantry for new sink with dishwasher. air hammer arrestor in wall at top out phase. test above slab. 6. any work additional to qualifications or plumbing scope is billed as additional at t&m rate · 125 m away
- 9931 Capridge DrSep 24, 2020Remove existing roof and install new roof · 128 m away
- 8936 Aldwick CirApr 13, 2026Installing 6 steel piles to prevent further downward movement of the slab · 130 m away