Sewer relay permitted at 8914 Fenchurch Road
A residential plumbing permit for a sewer relay at 8914 Fenchurch Road was filed on October 27, 2025. The City of Dallas record lists permit RES-PLM-25-006599.
Summarized from City of Dallas records · updated Oct 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 27, 2025
- since Oct 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8914 Fenchurch Rd
What work is permitted at 8914 Fenchurch Road?
A City of Dallas residential plumbing permit lists a sewer relay. The permit, RES-PLM-25-006599, was filed October 27, 2025.
Is a new home being built at 8914 Fenchurch Road?
The record provided is for a sewer relay, not a new-home construction permit. It was filed October 27, 2025.
When was the sewer relay permit filed for 8914 Fenchurch Road?
The City of Dallas filed the residential plumbing permit on October 27, 2025.
What is the permit number for work at 8914 Fenchurch Road?
The permit number is RES-PLM-25-006599. The City of Dallas record describes the work as a sewer relay.
Is the work at 8914 Fenchurch Road commercial or residential?
The City of Dallas lists it as a residential plumbing permit for a sewer relay.
Also being built nearby
All of 75238- 8910 Fenchurch RdOct 6, 2026Qualifications 1. relocate master bathroom drains in slab per plan with city inspection. provide 38' sq ft of cement demolition & patch. cap existing below slab as needed. 2. relocate existing pex water piping as needed as master bath & working pantry. install master tub iso valves under sink for mixing valve. 3. install shower pan liner with cement preslope and two total valves with two heads at master shower. water test pan for inspection. 4. install plumbing for new master closet washer and new utility room with sink and washer on 2nd floor with air hammer arrestors per code. 5. rework existing washer in working pantry for new sink with dishwasher. air hammer arrestor in wall at top out phase. test above slab. 6. any work additional to qualifications or plumbing scope is billed as additional at t&m rate · 5 m away
- 8917 Fenchurch RdJul 1, 2026Replacing all sewer under home up to the city · 13 m away
- 8905 Fenchurch RdMay 13, 2026Install natural gas line for standby generator · 18 m away
- 8811 Aldwick DrFeb 9, 2026New hvac installation · 82 m away
- 8834 Fenchurch RdAug 4, 2026Shawn bartlett plumber found a leak on a one inch iron gas pipe under house. cut out and repaired leak · 106 m away
- 10005 Linkwood DrApr 9, 2026Demolition and re-pour new approach and leadwalk · 107 m away
- 9004 Fenchurch RdSep 18, 2026This is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve · 119 m away
- 9008 Fenchurch RdOct 23, 2020Remove existing roof and install new roof · 119 m away
- 9020 Fenchurch RdMay 5, 2026Install 50 gallon gas water heater in attic (swap out) · 120 m away
- 10021 Lanshire DrMar 6, 2026Replace existing 50 gallon gas water heater with a new 50 gallon gas water heater in the same location · 121 m away
- 10020 Lanshire DrJun 5, 2026Service upgrade · 127 m away
- 10023 Linkwood DrJun 12, 2026Set -t pole, wiring totol house · 127 m away