8905 Fenchurch Rd
Dallas, TX 75238
Standby generator installation at 8905 Fenchurch Rd
Permits indicate a standby generator is being installed at 8905 Fenchurch Rd, including electrical work and a natural gas line. The City of Dallas filed the electrical permit on April 29, 2026, and the plumbing permit on May 13, 2026.
Summarized from City of Dallas records · updated May 13, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 13, 2026
- since Apr 29, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 8905 Fenchurch Rd
What is being installed at 8905 Fenchurch Rd?
City of Dallas permits indicate a standby generator installation, with related electrical work and a natural gas line.
When were permits filed for the generator at 8905 Fenchurch Rd?
The residential electrical permit was filed April 29, 2026, and the residential plumbing permit was filed May 13, 2026.
What does permit RES-ELC-26-002414 cover?
The City of Dallas residential electrical permit, filed April 29, 2026, describes a generator installation with an ATS.
What does permit RES-PLM-26-004999 cover?
The City of Dallas residential plumbing permit, filed May 13, 2026, covers installation of a natural gas line for a standby generator.
Is this a commercial generator project?
The records describe residential electrical and plumbing permits at 8905 Fenchurch Rd, rather than a commercial project.
Also being built nearby
All of 75238- 8910 Fenchurch RdOct 6, 2026Qualifications 1. relocate master bathroom drains in slab per plan with city inspection. provide 38' sq ft of cement demolition & patch. cap existing below slab as needed. 2. relocate existing pex water piping as needed as master bath & working pantry. install master tub iso valves under sink for mixing valve. 3. install shower pan liner with cement preslope and two total valves with two heads at master shower. water test pan for inspection. 4. install plumbing for new master closet washer and new utility room with sink and washer on 2nd floor with air hammer arrestors per code. 5. rework existing washer in working pantry for new sink with dishwasher. air hammer arrestor in wall at top out phase. test above slab. 6. any work additional to qualifications or plumbing scope is billed as additional at t&m rate · 15 m away
- 8917 Fenchurch RdJul 1, 2026Replacing all sewer under home up to the city · 15 m away
- 8914 Fenchurch RdOct 27, 2025Sewer relay · 18 m away
- 8834 Fenchurch RdAug 4, 2026Shawn bartlett plumber found a leak on a one inch iron gas pipe under house. cut out and repaired leak · 90 m away
- 8811 Aldwick DrFeb 9, 2026New hvac installation · 95 m away
- 8816 Fenchurch RdJan 15, 2026Replace 4 ton base horizontal gas system · 119 m away
- 10005 Linkwood DrApr 9, 2026Demolition and re-pour new approach and leadwalk · 125 m away
- 8771 Aldwick DrNov 6, 2025Water heater replacement 50 gal · 124 m away
- 8810 Fenchurch RdAug 4, 2026Gas test and repair · 125 m away
- 9004 Fenchurch RdSep 18, 2026This is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve · 129 m away
- 9008 Fenchurch RdOct 23, 2020Remove existing roof and install new roof · 129 m away
- 10021 Lanshire DrMar 6, 2026Replace existing 50 gallon gas water heater with a new 50 gallon gas water heater in the same location · 130 m away