9008 Fenchurch Rd
Dallas, TX 75238
9008 Fenchurch Rd: 1 project on record
City of Dallas lists 1 filing across 1 project at 9008 Fenchurch Rd, Dallas, TX 75238. The most recent, filed October 23, 2020, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Oct 23, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 23, 2020
- since Oct 23, 2020
- Largest scope
- —
- Listed value
- $24
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 9008 Fenchurch Rd
What is being built at 9008 Fenchurch Rd?
The latest filing (City of Dallas permit 2010236006, October 23, 2020) covers remove existing roof and install new roof.
How many permits and filings does 9008 Fenchurch Rd have?
1 filing across 1 project, from October 23, 2020 to October 23, 2020.
How much is the construction at 9008 Fenchurch Rd worth?
Permits at this address list about $24 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 9008 Fenchurch Rd?
Yes. Nearby filings include 9004 Fenchurch Rd (this is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve, Sep 18, 2026); 9020 Fenchurch Rd (install 50 gallon gas water heater in attic (swap out), May 5, 2026); 9018 Aldwick Dr (4-ton gas level 1 complete (r-454b)complete system replacement, Jul 16, 2025).
How do I get alerts for new permits at 9008 Fenchurch Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 9004 Fenchurch RdSep 18, 2026This is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve · 0 m away
- 9020 Fenchurch RdMay 5, 2026Install 50 gallon gas water heater in attic (swap out) · 1 m away
- 9018 Aldwick DrJul 16, 20254-ton gas level 1 complete (r-454b)complete system replacement · 109 m away
- 9951 Capridge DrOct 27, 2020Remove existing roof and install new roof · 111 m away
- 9031 Aldwick DrDec 9, 2025Remove all cast iron sewer underneath pier and beam home and replace it with schedule 40 pvc and 50-foot trench to replace the main sewer line · 114 m away
- 8917 Fenchurch RdJul 1, 2026Replacing all sewer under home up to the city · 114 m away
- 8924 Aldwick CirMay 27, 2026Gas test · 118 m away
- 8914 Fenchurch RdOct 27, 2025Sewer relay · 119 m away
- 8928 Aldwick CirAug 19, 2026Meter release · 122 m away
- 8910 Fenchurch RdOct 6, 2026Qualifications 1. relocate master bathroom drains in slab per plan with city inspection. provide 38' sq ft of cement demolition & patch. cap existing below slab as needed. 2. relocate existing pex water piping as needed as master bath & working pantry. install master tub iso valves under sink for mixing valve. 3. install shower pan liner with cement preslope and two total valves with two heads at master shower. water test pan for inspection. 4. install plumbing for new master closet washer and new utility room with sink and washer on 2nd floor with air hammer arrestors per code. 5. rework existing washer in working pantry for new sink with dishwasher. air hammer arrestor in wall at top out phase. test above slab. 6. any work additional to qualifications or plumbing scope is billed as additional at t&m rate · 124 m away
- 9931 Capridge DrSep 24, 2020Remove existing roof and install new roof · 129 m away
- 8905 Fenchurch RdMay 13, 2026Install natural gas line for standby generator · 129 m away