Sewer line replacement permitted at 9031 Aldwick Dr
A City of Dallas plumbing permit indicates that the sewer line beneath the pier-and-beam home at 9031 Aldwick Dr is to be replaced with Schedule 40 PVC. The permit was filed on December 9, 2025, under permit RES-PLM-25-008647.
Summarized from City of Dallas records · updated Dec 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 9, 2025
- since Dec 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRemove all cast iron sewer underneath pier and beam home and replace it with schedule 40 pvc and 50-foot trench to replace the main sewer line
Remove all cast iron sewer underneath pier and beam home and replace it with schedule 40 pvc and 50-foot trench to replace the main sewer line
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 9031 Aldwick Dr
What work is planned at 9031 Aldwick Dr?
A City of Dallas permit describes removing the cast-iron sewer line beneath the pier-and-beam home and replacing it with Schedule 40 PVC.
When was the sewer line permit filed at 9031 Aldwick Dr?
The permit was filed on December 9, 2025.
What is the permit number for 9031 Aldwick Dr?
The City of Dallas permit number is RES-PLM-25-008647.
Does the sewer work at 9031 Aldwick Dr include a trench?
Yes. The permit description includes a 50-foot trench to replace the main sewer line.
Is a new home being built at 9031 Aldwick Dr?
The available permit record describes sewer line replacement beneath a pier-and-beam home, not construction of a new home.
Also being built nearby
All of 75238- 9018 Aldwick DrJul 16, 20254-ton gas level 1 complete (r-454b)complete system replacement · 28 m away
- 9111 Aldwick DrNov 12, 2025Gas test for meter release · 72 m away
- 8924 Aldwick CirMay 27, 2026Gas test · 102 m away
- 8928 Aldwick CirAug 19, 2026Meter release · 103 m away
- 8936 Aldwick CirApr 13, 2026Installing 6 steel piles to prevent further downward movement of the slab · 106 m away
- 8944 Aldwick CirSep 24, 2020Remove existing roof and install new roof · 110 m away
- 9020 Fenchurch RdMay 5, 2026Install 50 gallon gas water heater in attic (swap out) · 113 m away
- 9008 Fenchurch RdOct 23, 2020Remove existing roof and install new roof · 114 m away
- 9004 Fenchurch RdSep 18, 2026This is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve · 114 m away
- 9949 Mccree RdJan 9, 2026Provide for removal of 200amp circuit to existing ac equipmentfurnish and install the following: one (1) 200amp 120/240volt exterior panel five (5) 20amp single phase circuits, and disconnects for new ac units replace four (4) exterior receptacles with gfci receptacles includes all coring through walls, and tunnels at sidewalks · 116 m away
- 9951 Capridge DrOct 27, 2020Remove existing roof and install new roof · 151 m away
- 10005 Shadyview DrMar 2, 2026Build new fence with an electric gate · 164 m away