8944 Aldwick Cir
Dallas, TX 75238
8944 Aldwick Cir: 1 project on record
City of Dallas lists 1 filing across 1 project at 8944 Aldwick Cir, Dallas, TX 75238. The most recent, filed September 24, 2020, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Sep 24, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Sep 24, 2020
- since Sep 24, 2020
- Largest scope
- —
- Listed value
- $12
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 8944 Aldwick Cir
What is being built at 8944 Aldwick Cir?
The latest filing (City of Dallas permit 2009245002, September 24, 2020) covers remove existing roof and install new roof.
How many permits and filings does 8944 Aldwick Cir have?
1 filing across 1 project, from September 24, 2020 to September 24, 2020.
How much is the construction at 8944 Aldwick Cir worth?
Permits at this address list about $12 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 8944 Aldwick Cir?
Yes. Nearby filings include 8936 Aldwick Cir (installing 6 steel piles to prevent further downward movement of the slab, Apr 13, 2026); 8928 Aldwick Cir (meter release, Aug 19, 2026); 8924 Aldwick Cir (gas test, May 27, 2026).
How do I get alerts for new permits at 8944 Aldwick Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 8936 Aldwick CirApr 13, 2026Installing 6 steel piles to prevent further downward movement of the slab · 9 m away
- 8928 Aldwick CirAug 19, 2026Meter release · 16 m away
- 8924 Aldwick CirMay 27, 2026Gas test · 20 m away
- 9018 Aldwick DrJul 16, 20254-ton gas level 1 complete (r-454b)complete system replacement · 83 m away
- 10023 Linkwood DrJun 12, 2026Set -t pole, wiring totol house · 90 m away
- 10005 Linkwood DrApr 9, 2026Demolition and re-pour new approach and leadwalk · 98 m away
- 9031 Aldwick DrDec 9, 2025Remove all cast iron sewer underneath pier and beam home and replace it with schedule 40 pvc and 50-foot trench to replace the main sewer line · 110 m away
- 9004 Fenchurch RdSep 18, 2026This is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve · 138 m away
- 9008 Fenchurch RdOct 23, 2020Remove existing roof and install new roof · 138 m away
- 9020 Fenchurch RdMay 5, 2026Install 50 gallon gas water heater in attic (swap out) · 138 m away
- 9046 Guildhall DrNov 16, 2026Nsfaa kitchen renovation and back of house addition- off the patio. 1/2 bath added in the space · 144 m away
- 8811 Aldwick DrFeb 9, 2026New hvac installation · 153 m away