9018 Aldwick Dr
Dallas, TX 75238
9018 Aldwick Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 9018 Aldwick Dr, Dallas, TX 75238. The most recent, filed July 16, 2025, covers: “4-ton gas level 1 complete (r-454b)complete system replacement”.
Compiled from City of Dallas records · updated Jul 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 16, 2025
- since Jul 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9018 Aldwick Dr
What is being built at 9018 Aldwick Dr?
The latest filing (City of Dallas permit RES-MEC-25-001317, July 16, 2025) covers 4-ton gas level 1 complete (r-454b)complete system replacement.
How many permits and filings does 9018 Aldwick Dr have?
1 filing across 1 project, from July 16, 2025 to July 16, 2025.
Is there other construction near 9018 Aldwick Dr?
Yes. Nearby filings include 9031 Aldwick Dr (remove all cast iron sewer underneath pier and beam home and replace it with schedule 40 pvc and 50-foot trench to replace the main sewer line, Dec 9, 2025); 8924 Aldwick Cir (gas test, May 27, 2026); 8928 Aldwick Cir (meter release, Aug 19, 2026).
How do I get alerts for new permits at 9018 Aldwick Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 9031 Aldwick DrDec 9, 2025Remove all cast iron sewer underneath pier and beam home and replace it with schedule 40 pvc and 50-foot trench to replace the main sewer line · 28 m away
- 8924 Aldwick CirMay 27, 2026Gas test · 74 m away
- 8928 Aldwick CirAug 19, 2026Meter release · 76 m away
- 8936 Aldwick CirApr 13, 2026Installing 6 steel piles to prevent further downward movement of the slab · 79 m away
- 8944 Aldwick CirSep 24, 2020Remove existing roof and install new roof · 83 m away
- 9111 Aldwick DrNov 12, 2025Gas test for meter release · 97 m away
- 9020 Fenchurch RdMay 5, 2026Install 50 gallon gas water heater in attic (swap out) · 109 m away
- 9008 Fenchurch RdOct 23, 2020Remove existing roof and install new roof · 109 m away
- 9004 Fenchurch RdSep 18, 2026This is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve · 109 m away
- 9949 Mccree RdJan 9, 2026Provide for removal of 200amp circuit to existing ac equipmentfurnish and install the following: one (1) 200amp 120/240volt exterior panel five (5) 20amp single phase circuits, and disconnects for new ac units replace four (4) exterior receptacles with gfci receptacles includes all coring through walls, and tunnels at sidewalks · 141 m away
- 10005 Linkwood DrApr 9, 2026Demolition and re-pour new approach and leadwalk · 158 m away
- 10023 Linkwood DrJun 12, 2026Set -t pole, wiring totol house · 159 m away