Electrical work for AC and mini-split units at 9949 McCree Rd
City of Dallas permits indicate electrical work for air-conditioning equipment at 9949 McCree Rd. A November 7, 2025 permit covers connections for five mini-split units and two future units; a January 9, 2026 permit covers a new exterior panel, circuits and disconnects for new AC units.
Summarized from City of Dallas records · updated Jan 9, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jan 9, 2026
- since Nov 7, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsProvide for removal of 200amp circuit to existing ac equipmentfurnish and install the following: one (1) 200amp 120/240volt exterior panel five (5) 20amp single phase circuits, and disconnects for new ac units replace four (4) exterior receptacles with gfci receptacles includes all coring through walls, and tunnels at sidewalks
Provide for removal of 200amp circuit to existing ac equipmentfurnish and install the following: one (1) 200amp 120/240volt exterior panel five (5) 20amp single phase circuits, and disconnects for new ac units replace four (4) exterior receptacles with gfci receptacles includes all coring through walls, and tunnels at sidewalks
City of Dallas permitCommercial Electrical PermitReplace 200a ac disconnect with n3r panelfurnish and install connection to five (5) single phase mini split unitsfurnish and install connection for two (2) future units
Replace 200a ac disconnect with n3r panelfurnish and install connection to five (5) single phase mini split unitsfurnish and install connection for two (2) future units
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 9949 Mccree Rd
What is being built at 9949 McCree Rd in Dallas?
City permits describe electrical work for AC equipment, including connections for mini-split units. They do not describe a new building.
Is new HVAC equipment planned at 9949 McCree Rd?
The permits refer to five mini-split units, two future units and new AC units. They cover electrical work and do not confirm when equipment will be installed.
When were permits filed for 9949 McCree Rd?
The City of Dallas filed commercial electrical permit COM-ELC-25-003056 on November 7, 2025, and permit COM-ELC-26-000072 on January 9, 2026.
What electrical work is permitted at 9949 McCree Rd?
The permits describe replacing an AC disconnect, connecting five mini-split units and two future units, and installing a 200-amp exterior panel, circuits and disconnects for new AC units.
Does the permit say what business will be at 9949 McCree Rd?
No business or occupant is named in the available City of Dallas permit records.
Also being built nearby
All of 75238- 9951 Capridge DrOct 27, 2020Remove existing roof and install new roof · 75 m away
- 9931 Capridge DrSep 24, 2020Remove existing roof and install new roof · 95 m away
- 9111 Aldwick DrNov 12, 2025Gas test for meter release · 100 m away
- 9031 Aldwick DrDec 9, 2025Remove all cast iron sewer underneath pier and beam home and replace it with schedule 40 pvc and 50-foot trench to replace the main sewer line · 116 m away
- 9018 Aldwick DrJul 16, 20254-ton gas level 1 complete (r-454b)complete system replacement · 141 m away
- 9020 Fenchurch RdMay 5, 2026Install 50 gallon gas water heater in attic (swap out) · 141 m away
- 9008 Fenchurch RdOct 23, 2020Remove existing roof and install new roof · 142 m away
- 9004 Fenchurch RdSep 18, 2026This is to replace water main line from city meter to house with all new connections. a new whole house shut off valve and also a new double check valve · 142 m away
- 10005 Shadyview DrMar 2, 2026Build new fence with an electric gate · 165 m away
- 9934 Parkford DrSep 29, 2026Drain repairs · 169 m away
- 9952 Parkford DrAug 25, 2026Nsfaa proposed detailed description of work: remove an existing 7?ft tall by 10?ft non?load?bearing partition wall, including demolition and disposal of wall materials. work includes removal of one junction box, one light fixture with its switch, and one gfci outlet that were previously mounted on the wall being removed.install approximately 20 linear feet of new 12/2 romex cable routed continuously through the attic from the original circuit location to the new connection point. provide proper support with staples every 4 feet along horizontal runs. extend power to a new 4?gang junction box located on the north side of the upstairs area, then route conductors up through the fur?down and into the remaining structural post, reconnecting to the existing junction box that originally served the removed wall.all wiring will be terminated inside approved enclosures, secured per nec requirements, and connected to the existing 20?amp breaker supplying the circuit. no load?bearing structural components are altered · 175 m away
- 9929 Parkford DrJul 22, 2025Add minisplit hvac system to garage · 181 m away