9929 Parkford Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 9929 Parkford Dr, Dallas, TX 75238. The most recent, filed July 22, 2025, covers: “Add minisplit hvac system to garage”.
Compiled from City of Dallas records · updated Jul 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 22, 2025
- since Jul 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9929 Parkford Dr
What is being built at 9929 Parkford Dr?
The latest filing (City of Dallas permit RES-MEC-25-001414, July 22, 2025) covers add minisplit hvac system to garage.
How many permits and filings does 9929 Parkford Dr have?
1 filing across 1 project, from July 22, 2025 to July 22, 2025.
Is there other construction near 9929 Parkford Dr?
Yes. Nearby filings include 9935 Parkford Dr (3 ton hvac unit installation and ductwork, Nov 5, 2026); 9934 Parkford Dr (drain repairs, Sep 29, 2026); 9917 Parkford Dr (10’ front side drive approach18’ alley side drive approach, Sep 16, 2025).
How do I get alerts for new permits at 9929 Parkford Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 9935 Parkford DrNov 5, 20263 ton hvac unit installation and ductwork · 13 m away
- 9934 Parkford DrSep 29, 2026Drain repairs · 13 m away
- 9917 Parkford DrSep 16, 202510’ front side drive approach18’ alley side drive approach · 25 m away
- 9952 Parkford DrAug 25, 2026Nsfaa proposed detailed description of work: remove an existing 7?ft tall by 10?ft non?load?bearing partition wall, including demolition and disposal of wall materials. work includes removal of one junction box, one light fixture with its switch, and one gfci outlet that were previously mounted on the wall being removed.install approximately 20 linear feet of new 12/2 romex cable routed continuously through the attic from the original circuit location to the new connection point. provide proper support with staples every 4 feet along horizontal runs. extend power to a new 4?gang junction box located on the north side of the upstairs area, then route conductors up through the fur?down and into the remaining structural post, reconnecting to the existing junction box that originally served the removed wall.all wiring will be terminated inside approved enclosures, secured per nec requirements, and connected to the existing 20?amp breaker supplying the circuit. no load?bearing structural components are altered · 44 m away
- 9932 Ridgehaven DrMar 23, 2026Install gas line from the meter to the house.install a gas line from the meter to the generator · 88 m away
- 9866 Parkford DrDec 10, 2025House to city sewer repipe · 156 m away
- 9854 Ridgehaven DrJul 3, 2025Install new havc complete system · 157 m away
- 9949 Mccree RdJan 9, 2026Provide for removal of 200amp circuit to existing ac equipmentfurnish and install the following: one (1) 200amp 120/240volt exterior panel five (5) 20amp single phase circuits, and disconnects for new ac units replace four (4) exterior receptacles with gfci receptacles includes all coring through walls, and tunnels at sidewalks · 181 m away
- 9924 Lakemere DrAug 20, 2025Meter and riser repair · 185 m away
- 10005 Shadyview DrMar 2, 2026Build new fence with an electric gate · 187 m away
- 10020 Parkford DrAug 9, 2026From the gas meter to the house · 188 m away
- 10025 Parkford DrApr 17, 2026Two-stage 5-ton gas full system replacement · 195 m away