9910 Lanshire Dr
Dallas, TX 75238
9910 Lanshire Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 9910 Lanshire Dr, Dallas, TX 75238. The most recent, filed September 17, 2025, covers: “Remove old shingles and replace roof”.
Compiled from City of Dallas records · updated Sep 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 17, 2025
- since Sep 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9910 Lanshire Dr
What is being built at 9910 Lanshire Dr?
The latest filing (City of Dallas permit RES-ROOF-25-000893, September 17, 2025) covers remove old shingles and replace roof.
How many permits and filings does 9910 Lanshire Dr have?
1 filing across 1 project, from September 17, 2025 to September 17, 2025.
Is there other construction near 9910 Lanshire Dr?
Yes. Nearby filings include 9911 Lanshire Dr (partial under slab sewer pipe replacement - hallbathroom, master bathroom, a/c condensationdrain & the yard sewer line onlyexcavation to, re-route / replace see diagram (hall bathroom, masterbathroom & a/c condensation drain in front flower bed line underhome sewer pipes only) of the plumbing sewer drainpipe under thehome only. our plan reroutes the under-slab/home sewer pipe andconnects it back into the yard sewer line at the city tap area ,effectively replacing the yard sewer line as well, Apr 7, 2026); 9907 Lanshire Dr (repair gas leak on yard service, Aug 4, 2026); 9915 Lanshire Dr (2.5 ton coil condenser replacement, Sep 28, 2026).
How do I get alerts for new permits at 9910 Lanshire Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 9911 Lanshire DrApr 7, 2026Partial under slab sewer pipe replacement - hallbathroom, master bathroom, a/c condensationdrain & the yard sewer line onlyexcavation to, re-route / replace see diagram (hall bathroom, masterbathroom & a/c condensation drain in front flower bed line underhome sewer pipes only) of the plumbing sewer drainpipe under thehome only. our plan reroutes the under-slab/home sewer pipe andconnects it back into the yard sewer line at the city tap area ,effectively replacing the yard sewer line as well · 13 m away
- 9907 Lanshire DrAug 4, 2026Repair gas leak on yard service · 14 m away
- 9915 Lanshire DrSep 28, 20262.5 ton coil condenser replacement · 14 m away
- 9924 Spirehaven LnDec 16, 202550 gallon gas water heater · 103 m away
- 9919 Spirehaven LnOct 30, 2020Install water heater · 111 m away
- 9846 Chiswell RdJul 29, 2026Installation of new aircondition equipment · 114 m away
- 9824 Spirehaven LnJan 21, 2026Adding plumbing for a half bathroom on the 2nd floor · 129 m away
- 8834 Fenchurch RdAug 4, 2026Shawn bartlett plumber found a leak on a one inch iron gas pipe under house. cut out and repaired leak · 129 m away
- 8817 Fenchurch RdAug 25, 2025Replace existing fence same height (8ft) and same location · 132 m away
- 9832 Lanshire DrMay 12, 2026Full under pier & beam sewer pipe replacementexcavation to, re-route / replace see diagram (hall bathroom, masterbathroom, kitchen & washer line under home sewer pipes only) ofthe plumbing sewer drainpipe under the home only. our planreroutes the under-slab/home sewer pipe and connects it back intothe yard sewer line at the city tap area , effectively replacing the yardsewer line as well · 135 m away
- 8816 Fenchurch RdJan 15, 2026Replace 4 ton base horizontal gas system · 136 m away
- 8810 Fenchurch RdAug 4, 2026Gas test and repair · 139 m away