9853 Broken Bow Rd
Dallas, TX 75238
9853 Broken Bow Rd: 1 project on record
City of Dallas lists 1 filing across 1 project at 9853 Broken Bow Rd, Dallas, TX 75238. The most recent, filed December 21, 2020, covers: “Chnage 2 hvac systems”.
Compiled from City of Dallas records · updated Dec 21, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 21, 2020
- since Dec 21, 2020
- Largest scope
- —
- Listed value
- $2
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 9853 Broken Bow Rd
What is being built at 9853 Broken Bow Rd?
The latest filing (City of Dallas permit 2012216005, December 21, 2020) covers chnage 2 hvac systems.
How many permits and filings does 9853 Broken Bow Rd have?
1 filing across 1 project, from December 21, 2020 to December 21, 2020.
How much is the construction at 9853 Broken Bow Rd worth?
Permits at this address list about $2 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 9853 Broken Bow Rd?
Yes. Nearby filings include 9834 Broken Bow Rd (replace 5 ton condenser and coil only, Aug 5, 2026); 9847 Crestwick Dr (replace 4 ton base upflow gas system, Dec 3, 2025); 9807 Broken Bow Rd (remove existing roof and install new roof, Dec 22, 2020).
How do I get alerts for new permits at 9853 Broken Bow Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 9834 Broken Bow RdAug 5, 2026Replace 5 ton condenser and coil only · 16 m away
- 9847 Crestwick DrDec 3, 2025Replace 4 ton base upflow gas system · 105 m away
- 9807 Broken Bow RdDec 22, 2020Remove existing roof and install new roof · 106 m away
- 9830 Crestwick DrNov 9, 2026Nsfaa-9830 crestwick - construct a new sfd · 117 m away
- 9846 Crestwick DrApr 8, 2026We will access the plumbing system beneath the home through the existing pier and beam crawlspace to reach the main sewer line serving the master and hall bathrooms. all defective sections of the main sewer line will be removed and replaced with new schedule 40 pvc piping, installed to proper grade to ensure optimal flow.we will repair all identified breaks in the toilet lead bends, hall lavatory drain, and hall tub drain. additionally, we will replace approximately 30 feet of the kitchen main line, including the section where the line is broken at the kitchen stack.the laundry line will be properly reconnected using approved fittings to ensure system integrity and proper drainage. the existing abandoned laundry line, which is currently leaking due to system failure, will be eliminated and permanently disconnected.we will also repair the break at the cleanouts, as this area will be accessible during the repair process · 117 m away
- 9850 Crestwick DrDec 3, 2020Interior/ exterior remodel only · 118 m away
- 9816 Crestwick DrJun 2, 2025Gas line reroute from the meter to the riser in the crawl space · 122 m away
- 9618 Queenswood LnDec 29, 2020Replace or modify existing hvac · 127 m away
- 9429 Crestlake DrApr 7, 2026Hvac system replacement · 131 m away
- 9797 Broken Bow RdSep 23, 2026Installing 2 units of 4 tons gas furnace 96% with coil in attic with 13 outs and supply on the second floor with returns and first floor 13 outs with supply and returns in every room · 155 m away
- 9906 Crestwick DrApr 28, 2026Remove and replace shingles on roof · 176 m away
- 9915 Crestwick DrJun 20, 2025Provide power from existing exterior switch for 4 can lights, 1 ceiling fan, and 1 outlet · 182 m away