Recent · latest filing Aug 2026Residential
13126 Brushcreek Ln
Dallas, TX 75240
5-ton gas HVAC unit replacement permitted in Dallas
A 5-ton gas HVAC unit is being replaced at 13126 Brushcreek Ln in Dallas. The City of Dallas permit was filed on August 17, 2026, under permit RES-MEC-26-004461.
Summarized from City of Dallas records · updated Aug 17, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 17, 2026
- since Aug 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 13126 Brushcreek Ln
What work is planned at 13126 Brushcreek Ln?
A City of Dallas residential mechanical permit describes replacing a 5-ton gas HVAC unit.
When was the HVAC permit filed?
The permit was filed on August 17, 2026.
What is the permit number for 13126 Brushcreek Ln?
The permit number is RES-MEC-26-004461.
Is a new home being built at 13126 Brushcreek Ln?
The listed permit is for replacing a 5-ton gas HVAC unit; it does not describe new home construction.
Is the work at 13126 Brushcreek Ln residential?
Yes. The City of Dallas record classifies it as a residential mechanical permit.
Also being built nearby
All of 75240- 13121 Brushcreek LnOct 22, 2025Sewer combo liner repipe · 15 m away
- 13107 Brushcreek LnMar 3, 202650 gallon gas install in garage · 28 m away
- 13117 Meandering WaySep 19, 2025Re-roof · 93 m away
- 13218 Roaring Springs LnFeb 12, 2026Rsvp new home construction · 105 m away
- 13093 Meandering Way · The Church In DallasFeb 17, 2026Install new ac systems · 115 m away
- 13125 Tahoe DrJan 7, 2021Electrical remodel · 124 m away
- 13120 Tahoe DrMay 8, 20261 50 gallon gas located in the garage closet · 126 m away
- 13131 Tahoe DrJan 5, 2021Foundation repair · 138 m away
- 7526 Thistle LnSep 23, 2025Gas test ~ · 160 m away
- 13209 Flagstone LnJul 7, 2026Construct a 8 foot cedar fence · 190 m away
- 13336 Purple Sage RdOct 2, 2026Residential re-roof · 190 m away
- 13322 Purple Sage RdJan 15, 2026Mcr with battery install a 18.480 kw roof mounted pv solar system - 42 panels, a tesla powerwall-3, tesla energy gateway-3, enphase iq gateway, tesla remote meter. utility shutdown required to install teg between meter and (n) span · 195 m away