13740 Brookgreen Cir
Dallas, TX 75240
13740 Brookgreen Cir: 1 project on record
City of Dallas lists 1 filing across 1 project at 13740 Brookgreen Cir, Dallas, TX 75240. The most recent, filed May 12, 2025, covers: “Replace electric 40 gal water heater”.
Compiled from City of Dallas records · updated May 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 12, 2025
- since May 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 13740 Brookgreen Cir
What is being built at 13740 Brookgreen Cir?
The latest filing (City of Dallas permit RES-PLM-25-000134, May 12, 2025) covers replace electric 40 gal water heater.
How many permits and filings does 13740 Brookgreen Cir have?
1 filing across 1 project, from May 12, 2025 to May 12, 2025.
Is there other construction near 13740 Brookgreen Cir?
Yes. Nearby filings include 13761 Brookgreen Cir (hvc replacement, Jun 5, 2025); 13790 Brookgreen Cir (replace water service from meter to house, Jun 16, 2026); 13753 Brookgreen Cir (tunnel to repair building drain, Aug 13, 2025).
How do I get alerts for new permits at 13740 Brookgreen Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75240- 13761 Brookgreen CirJun 5, 2025Hvc replacement · 54 m away
- 13790 Brookgreen CirJun 16, 2026Replace water service from meter to house · 63 m away
- 13753 Brookgreen CirAug 13, 2025Tunnel to repair building drain · 72 m away
- 13794 Brookgreen CirOct 14, 2020Plumbing (pl) single family alteration · 73 m away
- 13747 Brookgreen CirSep 22, 2026Install 8 piers · 77 m away
- 13731 Brookgreen CirDec 4, 2020Tunnel approx. 20' from exposed building sewer to install double-sweep cleanouts. replace kitchen an · 93 m away
- 13735 Brookgreen CirAug 4, 2026Dig two access pits at the approved locations and tunnel approximately 55 feet beneath the home to access the existing cast iron plumbing under the slab.cut out and remove approximately 55 feet of existing cast iron pipe up to within a few inches of the bottom of the slab, leaving suitable connection points where required. transition from the existing vent stacks and remaining approved piping to new schedule 40 solid-core pvc using stainless steel transition bands.install the new pvc drainage system and secure it to the bottom of the slab using concrete anchors, all-thread rod, riser clamps, swivel hangers, and other approved supports. replace accessible lead closet bends and toilet flanges where required, reset the toilets with new wax seals, and caulk them to the floor. install required cleanouts and test fittings · 97 m away
- 13640 Brookgreen DrOct 19, 2026Sewer spot repair on laundry and tub branch line with new standpipe and clean-out for laundry. laundry p-trap via tunnel · 133 m away
- 13628 Brookgreen DrJun 26, 2026Replace electrical panel 200 amp indoor or outdoor panel · 134 m away
- 13612 Brookgreen DrSep 30, 2020Replace or modify existing hvac · 147 m away
- 13858 Brookgreen DrOct 26, 202613858 brookgreen install 6 concrete pilings to stabilize foundation · 171 m away
- 13873 Brookgreen DrSep 24, 2026Gas currently off but no leaks were found · 204 m away