Recent · latest filing Jun 2026Residential
13790 Brookgreen Cir
Dallas, TX 75240
Water service replacement permitted at 13790 Brookgreen Cir
A residential plumbing permit was issued on June 16, 2026, to replace the water service from the meter to the house at 13790 Brookgreen Cir. The City of Dallas permit record does not specify a project value or square footage.
Summarized from City of Dallas records · updated Jun 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 16, 2026
- since Jun 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 13790 Brookgreen Cir
What work is happening at 13790 Brookgreen Cir?
A City of Dallas residential plumbing permit covers replacing the water service from the meter to the house.
When was the plumbing permit issued?
The permit was filed on June 16, 2026.
What is the permit number for 13790 Brookgreen Cir?
The permit number is RES-PLM-26-006217.
Is a new house being built at 13790 Brookgreen Cir?
The record describes water service replacement from the meter to the house; it does not describe new home construction.
Who issued the permit for work at 13790 Brookgreen Cir?
The permit record is from the City of Dallas.
Also being built nearby
All of 75240- 13794 Brookgreen CirOct 14, 2020Plumbing (pl) single family alteration · 34 m away
- 13731 Brookgreen CirDec 4, 2020Tunnel approx. 20' from exposed building sewer to install double-sweep cleanouts. replace kitchen an · 58 m away
- 13740 Brookgreen CirMay 12, 2025Replace electric 40 gal water heater · 63 m away
- 13735 Brookgreen CirAug 4, 2026Dig two access pits at the approved locations and tunnel approximately 55 feet beneath the home to access the existing cast iron plumbing under the slab.cut out and remove approximately 55 feet of existing cast iron pipe up to within a few inches of the bottom of the slab, leaving suitable connection points where required. transition from the existing vent stacks and remaining approved piping to new schedule 40 solid-core pvc using stainless steel transition bands.install the new pvc drainage system and secure it to the bottom of the slab using concrete anchors, all-thread rod, riser clamps, swivel hangers, and other approved supports. replace accessible lead closet bends and toilet flanges where required, reset the toilets with new wax seals, and caulk them to the floor. install required cleanouts and test fittings · 71 m away
- 13747 Brookgreen CirSep 22, 2026Install 8 piers · 82 m away
- 13753 Brookgreen CirAug 13, 2025Tunnel to repair building drain · 91 m away
- 13761 Brookgreen CirJun 5, 2025Hvc replacement · 95 m away
- 13858 Brookgreen DrOct 26, 202613858 brookgreen install 6 concrete pilings to stabilize foundation · 110 m away
- 13640 Brookgreen DrOct 19, 2026Sewer spot repair on laundry and tub branch line with new standpipe and clean-out for laundry. laundry p-trap via tunnel · 127 m away
- 13873 Brookgreen DrSep 24, 2026Gas currently off but no leaks were found · 141 m away
- 13820 Methuen GreenDec 26, 2025Replace existing hvac system · 150 m away
- 13628 Brookgreen DrJun 26, 2026Replace electrical panel 200 amp indoor or outdoor panel · 152 m away