13904 Rolling Hills Ln
Dallas, TX 75240
14-by-24-foot carport permitted at 13904 Rolling Hills Ln
A 14-by-24-foot carport is planned at 13904 Rolling Hills Ln in Dallas. A City of Dallas residential alteration and addition permit was filed on February 16, 2026; the record does not state whether construction is complete.
Summarized from City of Dallas records · updated Feb 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 16, 2026
- since Feb 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 13904 Rolling Hills Ln
What is being built at 13904 Rolling Hills Ln?
A City of Dallas permit record describes a 14-by-24-foot carport build. The permit, RES-ALT-ADD-26-000257, was filed February 16, 2026.
Was a carport permitted at 13904 Rolling Hills Ln in Dallas?
Yes. The City of Dallas recorded a residential alteration and addition permit for a 14-by-24-foot carport on February 16, 2026.
How large is the carport planned at 13904 Rolling Hills Ln?
The permit description lists the carport as 14 by 24 feet.
When was the carport permit filed at 13904 Rolling Hills Ln?
The City of Dallas permit was filed February 16, 2026. Its permit number is RES-ALT-ADD-26-000257.
Is the carport at 13904 Rolling Hills Ln finished?
The available City of Dallas record documents a permit filed February 16, 2026, but does not state whether the carport is finished.
Also being built nearby
All of 75240- 8170 Clearsprings RdSep 24, 2026Gas leak repair and test · 105 m away
- 13735 Brookgreen CirAug 4, 2026Dig two access pits at the approved locations and tunnel approximately 55 feet beneath the home to access the existing cast iron plumbing under the slab.cut out and remove approximately 55 feet of existing cast iron pipe up to within a few inches of the bottom of the slab, leaving suitable connection points where required. transition from the existing vent stacks and remaining approved piping to new schedule 40 solid-core pvc using stainless steel transition bands.install the new pvc drainage system and secure it to the bottom of the slab using concrete anchors, all-thread rod, riser clamps, swivel hangers, and other approved supports. replace accessible lead closet bends and toilet flanges where required, reset the toilets with new wax seals, and caulk them to the floor. install required cleanouts and test fittings · 158 m away
- 8114 Clearsprings RdJun 10, 2026Sewer replacement under slab and in yard · 170 m away
- 13731 Brookgreen CirDec 4, 2020Tunnel approx. 20' from exposed building sewer to install double-sweep cleanouts. replace kitchen an · 170 m away
- 13747 Brookgreen CirSep 22, 2026Install 8 piers · 174 m away
- 8106 Clearsprings RdJul 2, 2025Repiping under house · 180 m away
- 13753 Brookgreen CirAug 13, 2025Tunnel to repair building drain · 185 m away
- 13831 Waterfall PlOct 21, 2026Moved toilet in master bathroom 4 inches, moved shower drain to create tub drain 2 1/2' (converted shower to tub) and connected to existing water lines under slab brought them through slab to create new manifold, branched off manifold and ran to sink, tub and toilet. then will need final for trim - tub toilet and vanity with faucet · 206 m away
- 13761 Brookgreen CirJun 5, 2025Hvc replacement · 215 m away
- 13873 Brookgreen DrSep 24, 2026Gas currently off but no leaks were found · 225 m away
- 13790 Brookgreen CirJun 16, 2026Replace water service from meter to house · 227 m away
- 8144 Greenhollow LnJul 28, 2025Mcr installation of a 7.29kw pv system · 236 m away