10019 Hickory Crossing
Dallas, TX 75243
Gas water heater permitted at 10019 Hickory Crossing
A 50-gallon gas water heater in the hall closet was permitted at 10019 Hickory Crossing on November 6, 2025. The City of Dallas record lists it as a residential plumbing permit, number RES-PLM-25-007139.
Summarized from City of Dallas records · updated Nov 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2025
- since Nov 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 10019 Hickory Crossing
What is being built at 10019 Hickory Crossing?
A City of Dallas permit covers installation of a 50-gallon gas water heater in the hall closet. It does not describe a new building.
When was the water heater permit filed?
The permit was filed on November 6, 2025.
What is the permit number for 10019 Hickory Crossing?
The residential plumbing permit number is RES-PLM-25-007139.
Is a new home being built at 10019 Hickory Crossing?
The available City of Dallas record is for a residential plumbing project: a 50-gallon gas water heater in the hall closet. It does not indicate new home construction.
Where will the gas water heater be installed?
The permit description says it will be installed in the hall closet at 10019 Hickory Crossing.
Also being built nearby
All of 75243- 10018 Silver Creek RdMar 16, 2026Installation of a 50-gallon gas water heater with new gas valve and drip leg · 81 m away
- 10007 Silver Creek RdAug 27, 2025Panel upgrade · 94 m away
- 12136 Cross Creek DrSep 23, 2026Replace existing 8 foot fence with an 8 foot fence. exact same footprint, no change at all to the layout of the fence · 108 m away
- 12132 Cross Creek DrMay 27, 2025Laking water in garage · 111 m away
- 12112 Cross Creek DrFeb 19, 202650 gal, gas · 135 m away
- 12111 Cross Creek DrSep 8, 2026Gas test with minor repairs · 138 m away
- 9930 Silver Creek RdApr 22, 2026Installed one 50 gallon gas water heater in hallway closet · 170 m away
- 12126 Pleasant Valley DrJul 25, 2025Replace waterline in front yard · 173 m away
- 9926 Silver Creek RdSep 8, 20265 ton basic gas system · 176 m away
- 12214 Pleasant Valley DrSep 16, 20252x 50 gal gas water heaters · 176 m away
- 9915 Hickory CrossingDec 8, 2025Gas line replacement · 182 m away
- 9910 Hickory CrossingMar 12, 2026Mcr with battery installation of 21.32kw solar panels on roof of dwelling and (3) sonnencore+20kwh battery · 188 m away