9910 Hickory Crossing

Dallas, TX 75243

Two rooftop solar-and-battery permits filed at 9910 Hickory Crossing

City of Dallas permits indicate rooftop solar panels and battery storage are planned for the residence at 9910 Hickory Crossing. One permit, filed July 16, 2025, covers 52 solar panels and three batteries; another, filed March 12, 2026, describes a 21.32-kW solar installation with three 20-kWh batteries.

Summarized from City of Dallas records · updated Mar 12, 2026

Projects
2
2 filings
Latest filing
Mar 12, 2026
since Jul 16, 2025
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Mcr with battery installation of 21.32kw solar panels on roof of dwelling and (3) sonnencore+20kwh battery

    Mcr with battery installation of 21.32kw solar panels on roof of dwelling and (3) sonnencore+20kwh battery

    City of Dallas permitResidential Solar/PV Permit
    Record
    RES-SOLAR-26-000101
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. For the installation of 52 rooftop solar panels and 3 batteries

    For the installation of 52 rooftop solar panels and 3 batteries

    City of Dallas permitResidential Solar/PV Permit
    Record
    RES-SOLAR-25-000218
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 9910 Hickory Crossing

What is being installed at 9910 Hickory Crossing?

City of Dallas permit records describe rooftop solar panels and battery storage at the residence. The two permits list separate solar-and-battery installations.

When were the solar permits filed for 9910 Hickory Crossing?

The City of Dallas filed one residential solar permit on July 16, 2025, and another on March 12, 2026.

How many solar panels are planned at 9910 Hickory Crossing?

The July 16, 2025 permit describes 52 rooftop solar panels. The March 12, 2026 permit describes a 21.32-kW solar installation but does not state a panel count.

How many batteries are included in the Hickory Crossing permits?

Each permit describes three batteries. The March 2026 permit specifies three SonnenCore+ 20-kWh batteries.

What are the permit numbers for the solar work at 9910 Hickory Crossing?

The July 16, 2025 permit is RES-SOLAR-25-000218. The March 12, 2026 permit is RES-SOLAR-26-000101.