11829 Abrams Rd
Dallas, TX 75243
11829 Abrams Rd: 12 projects on record
City of Dallas lists 12 filings across 12 projects at 11829 Abrams Rd, Dallas, TX 75243. The most recent, filed December 24, 2020, covers: “Remodel existing plumbing”.
Compiled from City of Dallas records · updated Dec 24, 2020
- Projects
- 12
- 12 filings
- Latest filing
- Dec 24, 2020
- since Dec 24, 2020
- Largest scope
- —
- Listed value
- $12
- partial · often understated
Permit & project history
12 projectsSources: City of Dallas
Questions about 11829 Abrams Rd
What is being built at 11829 Abrams Rd?
The latest filing (City of Dallas permit 2012233053, December 24, 2020) covers remodel existing plumbing.
How many permits and filings does 11829 Abrams Rd have?
12 filings across 12 projects, from December 24, 2020 to December 24, 2020.
How much is the construction at 11829 Abrams Rd worth?
Permits at this address list about $12 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Chick-Fil-A in Dallas?
11829 Abrams Rd is about 172 m from Chick-Fil-A (9386 Lyndon B Johnson Fwy). Its latest filing is for remodel existing plumbing.
Is there other construction near 11829 Abrams Rd?
Yes. Nearby filings include 11957 Abrams Rd (txdot electrical service for hwy camera, Jul 28, 2025); 11919 Abrams Rd (install walk-in cooler freezer combo, Jun 6, 2025); 9730 Abrams Rd (electrical release no work; new owner, existing retail center. need power for exterior lights only, Sep 17, 2026).
How do I get alerts for new permits at 11829 Abrams Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75243- 11957 Abrams RdJul 28, 2025Txdot electrical service for hwy camera · 81 m away
- 11919 Abrams RdJun 6, 2025Install walk-in cooler freezer combo · 107 m away
- 9730 Abrams RdSep 17, 2026Electrical release no work; new owner, existing retail center. need power for exterior lights only · 133 m away
- 9394 L B J FwyAug 23, 2026Rtu replacement- captiveaire unit · 134 m away
- 9386 L B J FwyJan 19, 2026Remove and replace 5 ton rtu with new 5 ton rtu- like for like · 172 m away
- 9386 Lyndon B Johnson Fwy · Chick-Fil-AJun 19, 2024Chick-fil-a #02097 abrams & lbj — new construction — ground up construction of quick service restaurant with drive-thru · 172 m away
- 9480 Forest LnJul 30, 2025Txdot electrical service for hwy camera · 224 m away
- 9405 Timberleaf DrAug 18, 20255 hybrid piersi spoke with jaysa, the plans examiner, and she confirmed that we can use one engineer's report for this permit, as long as the address is listed on it · 281 m away
- 9409 Timberleaf DrOct 17, 2025Whole home sewer repipe under slab approx 70ft · 288 m away
- 9404 Timberleaf DrOct 2, 2025Under slab sewer replacement · 292 m away
- 9411 Timberleaf DrDec 8, 2025Partial sewer replacement under slab via 35ft tunnel and new double cleanouts. we are not performing the excavation.and now replacing the full sewer system under the home, approximately 70ft - we did not perform the excavation · 292 m away
- 9406 Timberleaf DrAug 15, 2025• installing 12 total pilings (5 exterior, 7 via tunnel).• tunnel 27 lf.these are townhomes. the city advised us to apply for residential permits, with one permit per address · 295 m away