11990 N Central Expy
Dallas, TX 75243
Exhaust fan and boiler flue work at 11990 N Central Expy
City of Dallas permits filed June 26 through July 18, 2025, describe alterations to existing exhaust fans, ductwork, boiler flue and sanitary vent piping at 11990 N Central Expy. The work includes relocating and reconnecting three fans, adding roof curbs, and testing and balancing the fans.
Summarized from City of Dallas records · updated Jul 18, 2025
- Projects
- 7
- 7 filings
- Latest filing
- Jul 18, 2025
- since Jun 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsDisconnect power to three fans. extend power wiring, conduit and supports. reconnect power wiring
Disconnect power to three fans. extend power wiring, conduit and supports. reconnect power wiring
City of Dallas permitCommercial Electrical PermitExtend boiler flue. disconnect (3) exhaust fans. provide additional ductwork, supports and insulation to relocate the exhaust fans. reconnect exhaust fans at new location. extend control wiring. provide testing and balance to fans
Extend boiler flue. disconnect (3) exhaust fans. provide additional ductwork, supports and insulation to relocate the exhaust fans. reconnect exhaust fans at new location. extend control wiring. provide testing and balance to fans
City of Dallas permitCommercial Mechanical Permit• addition of (2) vertical segments to existing boiler flue• reroute existing 4" sanitary vent line to top of nearby roof.• uninstall (3) existing fans and power disconnects• route new ductwork and power disconnects to desired fan location• provide and install new roof curbs for (3) existing exhaust fans• reinstall (3) existing fans and power disconnects• controls reconnection• test & balance• roofing
• addition of (2) vertical segments to existing boiler flue• reroute existing 4" sanitary vent line to top of nearby roof.• uninstall (3) existing fans and power disconnects• route new ductwork and power disconnects to desired fan location• provide and install new roof curbs for (3) existing exhaust fans• reinstall (3) existing fans and power disconnects• controls reconnection• test & balance• roofing
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 11990 N Central Expy
What work is being done at 11990 N Central Expy?
Dallas permits describe work on three existing exhaust fans, including relocation, new ductwork and reconnection. The permits also cover boiler flue and sanitary vent piping work.
When were permits filed for work at 11990 N Central Expy?
The four City of Dallas permits were filed from June 26 to July 18, 2025. They cover commercial alteration, mechanical, electrical and plumbing work.
Are the exhaust fans being replaced at 11990 N Central Expy?
The June 26, 2025, alteration permit describes uninstalling and reinstalling three existing exhaust fans at a new location, not replacing them. It also includes new ductwork, roof curbs and power disconnects.
What does permit COM-MEC-25-000332 cover?
Filed July 11, 2025, the mechanical permit covers extending a boiler flue, relocating three exhaust fans with additional ductwork, and extending control wiring. It also calls for testing and balancing the fans.
What construction is happening near Alta Churchill Crossing on North Central Expressway?
At 11990 N Central Expy, about 39 meters from Alta Churchill Crossing, Dallas permits describe alterations to existing exhaust fans, ductwork, a boiler flue and sanitary vent piping. The filings date from June 26 through July 18, 2025.
Also being built nearby
All of 75243- 11990 North Central Expressway · Columbia Hospital Medical City DallasFeb 4, 2026Mcd hs cath — renovation/alteration — the project consists of first-generation shell finish out of space at the medical city dallas heart and spine hospital at 11970 north central expressway, dallas, texas 75230
- 12222 N Central ExpyJun 6, 2025Remove all existing debris from roof, slice existing tpo in 10x10 sections and leave in place. remove and dispose of existing flashings and coping. install new 115 mil fleeceback tpo, new flashings, and new coping cap. provide 20 year ndl warranty · 27 m away
- 12224 N Central Expressway · Churchill Crossing Apartments, LLCOct 5, 2026Alta churchill crossing — new construction — new 308 unit apartment complex with a ground level amenity center and a 5th level roof deck amenity · 39 m away
- 12228 N. Central Expressway · Healthcare RealtyOct 28, 2024Orthopedic institute of north texas — new construction — interior finish-out for first generation shell space · 52 m away
- 12228 North Central Expwy · Hatteras Pavilion II LLCNov 12, 2025Kelly schultz — new construction — interior finish out for medical office · 52 m away
- 12228 N Central Expy · Healthcare Realty Services LLCApr 7, 2026Duct work and vavs · 52 m away
- 12228 N Central ExpyFeb 20, 2026Install medical gases suite 360 · 52 m away
- 11970 North Central Expressway · Columbia Hospital Medical City DallasJun 23, 2026Heart & spine chapel — renovation/alteration — the scope of work includes construction documents and construction administration services for the proposed reconfiguration of interior spaces at the medical city dallas heart & spine hospital to create a dedicated chapel space · 66 m away
- 11970 N Central Expressway · Medical City DallasNov 9, 2026Mcd hs - nuc med — renovation/alteration — project consists of a nuc ct replacement + renovation within the room and control room · 66 m away
- 11970 North Central Expwy · Healthcare RealtyOct 11, 2024Humanaut — renovation/alteration — renovation to existing medical office space for new tenant · 66 m away
- 11970 N Central ExpySep 17, 2026Electrical work to reconfigure admin office at mcd heart & spine hospital to construct a 200 sq ft chapel · 66 m away
- 12230 Coit Rd · Cpi/Ahp Coit Mob Owner, LPJan 22, 2024Spec suite 120 — renovation/alteration — a 2,297 useable sq ft tenant renovation within coit mob in dallas, texas · 204 m away