12230 Coit Rd
Dallas, TX 75251 · Cpi/Ahp Coit Mob Owner, LP
Spec Suite 120 renovation at Coit Medical Office Building
A 2,297-square-foot tenant renovation for Spec Suite 120 was registered on January 22, 2024, at the Coit Medical Office Building. The Texas Department of Licensing and Regulation lists the project as closed.
Summarized from Texas Department of Licensing and Regulation, City of Dallas records · updated Jan 22, 2024
- Projects
- 8
- 8 filings
- Latest filing
- Jan 22, 2024
- since Jan 22, 2024
- Largest scope
- 2,297 sf
- Estimated cost
- $230K
- state registration
Where this project stands
CompletedSpec Suite 120
2,297 sq ft · $230K est.
- RegisteredJan 22, 2024
- Plan review
- ConstructionFeb '24 – Jun '24
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
8 projectsA 2,297 useable sq ft tenant renovation within coit mob in dallas, texas. — coit medical office building
TDLR project registrationRenovation/AlterationProject Closed2,297 sq ft$230K est.- Project #
- TABS2024009759
- Tenant / owner
- Spec Suite 120
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation · City of Dallas
Questions about 12230 Coit Rd
What is being built at 12230 Coit Road?
Records describe a 2,297-square-foot tenant renovation for Spec Suite 120 within the Coit Medical Office Building. TDLR registration TABS2024009759 is dated January 22, 2024.
Is a new medical office building being built at 12230 Coit Road?
The record describes an interior tenant renovation in the existing Coit Medical Office Building, not construction of a new building.
When was the Spec Suite 120 renovation permitted?
The TDLR project registration was filed January 22, 2024. Its listed status is Project Closed.
How large is the renovation at 12230 Coit Road?
The project is listed as 2,297 usable square feet.
How much will the Coit Road renovation cost?
The applicant's estimated cost for the project is $229,700. This is an estimate, not a reported final cost.
What is being renovated near Medical City Dallas?
Spec Suite 120, a 2,297-square-foot tenant space in the Coit Medical Office Building at 12230 Coit Road, was registered for renovation on January 22, 2024. Medical City Dallas is listed about 182 meters away.
When will Spec Suite 120 open?
The available records do not provide an opening date. TDLR lists the renovation project as closed.
Also being built nearby
All of 75251- 12230 Coit Road · 12230 Coit RoadNov 22, 2024Reliant infusion — renovation/alteration — interior office renovation
- 12271 Coit RdApr 27, 2026Install/replace 4 outside lightining due to crash at facility · 65 m away
- 12121 Coit RdDec 8, 2025Install backflow “ · 129 m away
- 12400 Coit RdJun 8, 2026Mcr install new 70 lights 2x4 led panel lights fixtures and outlets, install new carpet tile all throughout, new cabinets, new walls as per drawings. paint all through out · 153 m away
- 12400 Coit RdJun 23, 202614 data outlet boxes, 42 power receptacles,4 gfci power receptacles, 36 light fixtures, 5 emergency lights, 14 light switches, 7 exit lights · 153 m away
- 11970 North Central Expwy · Healthcare RealtyOct 11, 2024Humanaut — renovation/alteration — renovation to existing medical office space for new tenant · 182 m away
- 11970 N Central Expressway · Medical City DallasNov 9, 2026Mcd hs - nuc med — renovation/alteration — project consists of a nuc ct replacement + renovation within the room and control room · 182 m away
- 11970 North Central Expressway · Columbia Hospital Medical City DallasJun 23, 2026Heart & spine chapel — renovation/alteration — the scope of work includes construction documents and construction administration services for the proposed reconfiguration of interior spaces at the medical city dallas heart & spine hospital to create a dedicated chapel space · 182 m away
- 11970 N Central ExpySep 17, 2026Electrical work to reconfigure admin office at mcd heart & spine hospital to construct a 200 sq ft chapel · 182 m away
- 11990 North Central Expressway · Columbia Hospital Medical City DallasFeb 4, 2026Mcd hs cath — renovation/alteration — the project consists of first-generation shell finish out of space at the medical city dallas heart and spine hospital at 11970 north central expressway, dallas, texas 75230 · 204 m away
- 11990 N Central ExpyJul 18, 2025Extend sanitary vent piping · 204 m away
- 12222 N Central ExpyJun 6, 2025Remove all existing debris from roof, slice existing tpo in 10x10 sections and leave in place. remove and dispose of existing flashings and coping. install new 115 mil fleeceback tpo, new flashings, and new coping cap. provide 20 year ndl warranty · 218 m away