12332 Ferris Creek Ln
Dallas, TX 75243
20-module rooftop solar installation permitted in Dallas
A residential rooftop solar installation with 20 modules and an 8.1 kW system was permitted at 12332 Ferris Creek Ln on October 6, 2025. A separate plumbing permit for a whole-system gas piping air test was filed on October 2, 2025.
Summarized from City of Dallas records · updated Oct 6, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 6, 2025
- since Oct 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 12332 Ferris Creek Ln
What is being built at 12332 Ferris Creek Ln?
City of Dallas permit records indicate a residential rooftop solar installation with 20 modules and an 8.1 kW system. The permit was filed October 6, 2025.
Is solar being installed at 12332 Ferris Creek Ln in Dallas?
A City of Dallas residential solar permit indicates a roof-mounted installation of 20 modules, rated at 8.1 kW. The permit number is RES-SOLAR-25-000514, filed October 6, 2025.
How large is the solar system permitted at 12332 Ferris Creek Ln?
The permit description lists a 20-module, 8.1 kW roof-mounted solar system. It was filed with the City of Dallas on October 6, 2025.
When was the solar permit filed for 12332 Ferris Creek Ln?
The residential solar permit was filed October 6, 2025. Its permit number is RES-SOLAR-25-000514.
What is the gas piping permit for at 12332 Ferris Creek Ln?
A City of Dallas residential plumbing permit describes a whole-system gas piping air test. It was filed October 2, 2025, under permit number RES-PLM-25-005598.
Also being built nearby
All of 75243- 12330 Ferris Creek LnSep 29, 2025Whole system gas piping air test · 4 m away
- 12339 Ferris Creek LnFeb 19, 2026Water heater replacement · 19 m away
- 12348 Ferris Creek LnJul 21, 2026Foundation repair installing 41 piers · 27 m away
- 12385 Halima StDec 14, 2020Install fence · 76 m away
- 9709 Chimney Hill LnOct 1, 2025Juarez landscaping and construction will be constructing a privacy fence made of cedar wood, which will measure 388 feet in width and stand 8 feet tall, featuring a board-on-board design. the project will begin with the demolition of the existing brick wall, which is also 388 feet long. once that is completed, we will remove and haul away the debris. next, we will start working on the fence by installing 10-foot tall metal posts, which will be dug 2 feet into the ground and secured with concrete. after the concrete has cured, we will install horizontal rails made of pressure-treated pine wood, , and secure them with brackets and screws.once the rails are properly installed, we will add cedar wood boards in a board-on-board style, using 8x5.5 inch boards. finally, we will add a cedar trim and stain the fence on both sides. the new fence will be constructed in the same location as the current brick wall after it has been removed · 93 m away
- 12304 Halima StJun 24, 2026This is part of a board of adjustment case (# boa-255-000106) and diana barkume at the planning department can provide you with the pertinent information. i propose to have installed an 8-ft board-on-board cedar fence on my property line running parallel to chimney hill lane up to my sight triangle. there will also be an 8-ft board-on-board gate perpendicular to this fencing and running up to my house.where the sight triangle starts, i plan on having installed a 6-ft cedar fence that is no more than 50% opaque and continuing that fencing along my property line on ferris creek lane. i need to know if a permit will be required for the whole fence, or just the 8-ft part, because the zoninig is multi-family and my proeprty lien on ferris creek lane is considered front yard. the boa approved my sight triangle line to be along the same line that the existing brick wall is on. the whole brick wall along my property lines will be demolished in favor of building the new wood fence · 95 m away
- 12305 Halima StSep 8, 2026The existing brick wall has partially fallen due to storms occured last year and a month ago. to demolish the remaining wall and replace the whole brick wall with 101 ft board-on-board fence, 8ft pacific cedar prime, 5.5" cedar prime,10 ft 13-gauge metal fence posts. it has been approved by boa. the case number is boa-25-000104 · 101 m away
- 9655 Chimney Hill LnJul 29, 2026Repair meterbase per oncor. building 24, apartment 1004. meter has been removed by oncur. customer is currently without power · 146 m away
- 9806 Cross Creek CtFeb 13, 2026Water heater traditional change-out · 178 m away
- 9806 Matchpoint PlOct 20, 2025Install / replace existing electrical tankless water heater with new one · 184 m away
- 9810 Matchpoint PlDec 19, 202512’ ft tunnel to fix water leak and flange repair · 185 m away
- 12219 Center Court DrMay 28, 2026Correct height of toilet flance in water closet · 194 m away
More solar installs in 75243.