8434 Greenstone Dr
Dallas, TX 75243
Gas riser replacement permitted at 8434 Greenstone Dr
A residential plumbing permit indicates work to repair a gas leak by replacing the gas riser at the home. The City of Dallas issued the permit on September 10, 2026 (RES-PLM-26-009594).
Summarized from City of Dallas records · updated Sep 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 10, 2026
- since Sep 10, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8434 Greenstone Dr
What work is happening at 8434 Greenstone Dr?
A City of Dallas residential plumbing permit indicates a gas leak repair involving replacement of the gas riser. The permit was issued September 10, 2026.
Is a new home being built at 8434 Greenstone Dr?
The available permit record describes a gas riser replacement to repair a leak, not construction of a new home. The permit number is RES-PLM-26-009594.
When was the gas repair at 8434 Greenstone Dr permitted?
The City of Dallas permit is dated September 10, 2026.
What is permit RES-PLM-26-009594 for?
It is a residential plumbing permit for repairing a gas leak by replacing the gas riser at 8434 Greenstone Dr.
How much will the work at 8434 Greenstone Dr cost?
The available permit record does not report a project cost or valuation.
Also being built nearby
All of 75243- 8431 Greenstone DrOct 21, 2024Sfd addition and remodel for murfam holdings, llc · 16 m away
- 8411 Greenstone DrFeb 3, 2026Install 6 total pilings · 62 m away
- 8465 Greenstone DrMay 29, 20254 ton system · 71 m away
- 9418 Pinewood DrMar 13, 2026Sewer line repair · 92 m away
- 9405 Pinewood DrAug 27, 2025Gas test for meter release · 100 m away
- 9433 Pinewood DrJan 23, 2026Installed 50 gal electric wh in bathroom · 110 m away
- 8415 Gladwood LnJul 3, 2025Replacement of 29 ‘ of sewer line · 114 m away
- 8406 Gladwood LnJun 3, 2025We are upgrading the electrical service, relocating panel in closet to exterior wall, replacing meter base and service mast, upgrading grounding and bonding · 124 m away
- 9315 Pinewood DrMar 11, 2026Proposed installation location and wire run:run new 60a 240v circuit from 200a main panel via surface-mounted exterior conduit, run low to the ground. hardwire gm powerup 2 charger on front left exterior wall of home, the charger will be installed on a 60a circuit and will draw up to 48a continuous · 128 m away
- 9309 Pinewood DrAug 11, 2025Replacement of two (2) ducts and a vent hood 6"hard pipe · 131 m away
- 8478 Birchcroft DrJun 23, 2025Install 40 gallon gas water heater in kitchen closet (swap out) · 184 m away
- 9406 Whittenburg GateOct 14, 2025Upgrade existing electrical service to 200 amp · 190 m away