Gas re-piping and water-line repair permits at 8619 Westfield Dr
City of Dallas permits indicate gas re-piping and a water-line repair at this residential address. The water-line repair permit was filed January 4, 2026, and the gas re-piping permit was filed January 15, 2026. The records do not indicate new construction.
Summarized from City of Dallas records · updated Jan 15, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jan 15, 2026
- since Jan 4, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 8619 Westfield Dr
What is being built at 8619 Westfield Dr in Dallas?
The records do not show a new building. They show residential plumbing work: a water-line repair and gas re-piping.
What work is permitted at 8619 Westfield Dr?
City of Dallas records list a water-line repair by tunnel under permit RES-PLM-26-000045 and gas re-piping with four appliance drops under permit RES-PLM-26-000581.
When were the permits filed for 8619 Westfield Dr?
The water-line repair permit was filed January 4, 2026. The gas re-piping permit was filed January 15, 2026.
What does the gas re-piping permit at 8619 Westfield Dr cover?
The January 15, 2026 permit describes 25 feet of main gas re-piping with four appliance drops for a furnace, water heater, stove, and dryer. Its permit number is RES-PLM-26-000581.
Is there a new home planned at 8619 Westfield Dr?
The available records do not indicate a new home or other new construction. They list plumbing repairs and a 2020 re-roof permit.
Was the roof replaced at 8619 Westfield Dr?
A City of Dallas record dated March 4, 2020, describes a re-roof under permit 2003031023.
Also being built nearby
All of 75243- 8625 Westfield DrFeb 19, 2026Slab leak water repair · 9 m away
- 8631 Westfield DrFeb 9, 2026X1 50 gal gas water heater in the garage in closet · 18 m away
- 8605 Westfield DrSep 2, 2026Water repair isolated cold water leak · 20 m away
- 8616 Westfield DrJul 10, 2025Install roof-mounted 10.08 kw pv system with pv battery back up. temporary powerkill required · 47 m away
- 9134 Woodshore DrJun 23, 2025Installing 5 total pilings (2 exterior, 3 breakouts) · 85 m away
- 9124 Woodshore DrAug 5, 2026Panel change and add smoke detectors · 92 m away
- 9120 Woodshore DrJan 20, 2026Gas test and remplaced a valve · 95 m away
- 8555 Westfield DrMar 2, 2026Meter repair · 123 m away
- 8827 Graywood DrMar 18, 2026Remove the existing 200 amp outdoor surface-mounted electrical panel and replace it with a new 200 amp outdoor-rated panel. the new panel will be securely mounted in the same location, and all existing branch circuits will be properly labeled, terminated, and reconnected.the existing surge arrestor will be carefully removed and the powerworx will be wired into the new panel, ensuring proper connections and functionality · 132 m away
- 8839 Graywood DrJul 23, 2026Rebuild service, relocate panel, installed new ground rods, added one circuit to garage, installed gfci · 150 m away
- 8714 Gladwood LnAug 17, 2026Replacement of yard gas line from meter to home. current line is not holding pressure, gas to home is currently off · 149 m away
- 8710 Westfield DrSep 24, 2026Nsfaa **scope of work – 29.5' w x 17' l combo patio cover & concrete****patio cover:**construct a custom 29.5' w x 17' l (392 sq ft) cedar attached patio cover with a gable/low-pitch slant roof, decorative front fascia/trim, and approximately 12' finished top height. customer-provided dimensions are assumed correct; discrepancies requiring additional materials/work will be handled by change order.entire structure to be constructed with cedar, including (4) 6"x6" front/exposed posts (inset 1'), headers, rafters, fascia, trim, pony walls, and tongue-and-groove ceiling. front span supported by up to four posts. include roofline tie-in with approximately 192 sq ft of additional framing, plywood, shingles, and flashing.**structural tie-in:**install new independent concrete footings with commercial-grade simpson brackets for posts. structurally attach patio cover to existing house wall studs for load transfer and lateral stability. bottom of 4"x12" header boards approximately 8.5' high; final elevations depend on existing soffit, windows, ledgers, and roofline.**roofing:**cedar rafters, headers, risers, fascia, and visible trim. install plywood roof decking, full waterproofing/moisture barrier, and 30-year shingles matching the existing home. flash new roof into existing roof on two sides for a weather-tight connection. provide 12" roof overhang on front, left, and far-right sides. **no gutters.****ceiling:**full tongue-and-groove cedar ceiling throughout covered area. homeowner to select available ready seal stain/color. speaker company to complete required speaker wiring before tongue-and-groove ceiling installation.**electrical:**provide one dedicated circuit for outdoor lighting, fan, and outlets, with up to 150' of wiring to breaker panel through attic. includes (6) recessed can lights with switch, placement per homeowner preference; (1) ceiling fan box (homeowner supplies fan; 3 nails living installs); and (2) outdoor outlets.**plans, engineering & permits:**3 nails living to prepare plans/blueprints for city permit submission. homeowner approval of plans, design, and style required before submission. unforeseen structural requirements will be communicated and may result in a change order, including third-party engineering if required.**concrete – 392 sq ft regular brushed concrete:**prepare site by protecting adjacent landscaping/hardscape, removing existing surface/vegetation as needed, hauling debris, and excavating approximately 8–10" below finished grade. install and compact 4–6" crushed stone/base to 95% standard proctor. form slab, install welded wire mesh (6x6 w1.4/w1.4) or rebar as required, and pour approximately 4" of 3000–3500 psi air-entrained concrete. provide control/construction joints per industry standards. finish with broom texture and bullnose or square edges per homeowner preference. remove forms, clean site, and apply two coats of approved sealer after proper cure time (typically 7–28 days). includes excavation, base, reinforcement, concrete, forms, equipment, labor, finishing, jointing, sealing, cleanup, one mobilization, and minor debris disposal.**concrete assumptions:**392 sq ft area; 4" slab thickness unless otherwise specified; 3000–3500 psi concrete subject to local requirements; suitable site access for equipment/material delivery; work subject to weather conditions.**exclusions:**any new concrete/slab extension not specifically included. final stain/sealer color selected by homeowner. additional structural work or engineering required due to unforeseen site/home conditions may be subject to change order.**drainage:**install approximately 85 linear feet of french drain · 153 m away