80-foot gas line replacement permitted at 8838 Echo Valley Dr
A residential plumbing permit filed October 27, 2025, indicates an 80-foot gas line replacement at 8838 Echo Valley Dr in Dallas. The City of Dallas record is permit RES-PLM-25-006583.
Summarized from City of Dallas records · updated Oct 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 27, 2025
- since Oct 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8838 Echo Valley Dr
What is being built at 8838 Echo Valley Dr?
A City of Dallas residential plumbing permit indicates that an 80-foot gas line is being replaced. The permit, RES-PLM-25-006583, was filed October 27, 2025.
Is there a new building planned at 8838 Echo Valley Dr?
The available record is for an 80-foot gas line replacement, not a new building. It was filed as a residential plumbing permit on October 27, 2025.
When was the gas line permit filed at 8838 Echo Valley Dr?
The permit was filed October 27, 2025. The City of Dallas lists it as permit RES-PLM-25-006583.
How long is the gas line being replaced at 8838 Echo Valley Dr?
The permit description says the work is to replace 80 feet of gas line. It was filed October 27, 2025.
What kind of permit was issued for 8838 Echo Valley Dr?
The City of Dallas record identifies it as a residential plumbing permit for an 80-foot gas line replacement. The permit number is RES-PLM-25-006583.
Also being built nearby
All of 75243- 8832 Echo Valley DrNov 11, 2025Gas test · 28 m away
- 8818 Echo Valley DrJul 16, 2025Shower pan and lead stub up for toilet · 65 m away
- 8808 Echo Valley DrNov 3, 2025Gas test, replace water hetaer & building sewer line in front yard · 73 m away
- 8910 Echo Valley DrApr 10, 202640ft main water line replacement · 91 m away
- 8922 Echo Valley DrMar 5, 2026Water heater · 99 m away
- 8857 Flint Falls DrNov 28, 2025Excavate and replace water main in yard 52 · 115 m away
- 8865 Flint Falls DrJul 30, 2026Gas repair · 116 m away
- 8849 Flint Falls DrNov 10, 2026Gas test and replace main gas line · 116 m away
- 9333 Locarno DrAug 20, 2026Electrical for addition want to validate moving panel · 150 m away
- 8809 Flint Falls DrAug 26, 20265 ton 15 straight cool change out · 153 m away
- 8909 Flint Falls DrFeb 16, 2026Proposed installation location and wire run:remove the existing 30a 2-pole hot tub breaker to vacate space for a new 60a 2-pole breaker in the 200a msp. route the circuit from the exterior panel into the crawlspace. run through the crawlspace and penetrate up into the garage. hardwire the evse on the left interior garage wall. the charger will be installed on a 60a circuit and will draw up to 48a continuous · 155 m away
- 9329 Locarno DrJul 11, 2025Replacing 50 gallon gas water heater · 158 m away