Permit filed for a hardwired EV charger in the garage

A City of Dallas electrical permit filed Feb. 16, 2026, indicates a hardwired EV charger is planned for the garage at 8909 Flint Falls Dr. The permit describes a new 60-amp circuit, with the charger drawing up to 48 amps continuously.

Summarized from City of Dallas records · updated Feb 16, 2026

Projects
1
1 filings
Latest filing
Feb 16, 2026
since Feb 16, 2026
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Proposed installation location and wire run:remove the existing 30a 2-pole hot tub breaker to vacate space for a new 60a 2-pole breaker in the 200a msp. route the circuit from the exterior panel into the crawlspace. run through the crawlspace and penetrate up into the garage. hardwire the evse on the left interior garage wall. the charger will be installed on a 60a circuit and will draw up to 48a continuous

    Proposed installation location and wire run:remove the existing 30a 2-pole hot tub breaker to vacate space for a new 60a 2-pole breaker in the 200a msp. route the circuit from the exterior panel into the crawlspace. run through the crawlspace and penetrate up into the garage. hardwire the evse on the left interior garage wall. the charger will be installed on a 60a circuit and will draw up to 48a continuous

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-000903
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 8909 Flint Falls Dr

What is being installed at 8909 Flint Falls Dr?

A City of Dallas residential electrical permit indicates a hardwired EV charger is planned for the garage. Permit RES-ELC-26-000903 was filed Feb. 16, 2026.

Is an EV charger being installed at 8909 Flint Falls Dr in Dallas?

Yes. Permit RES-ELC-26-000903 describes installing a hardwired EV charger on the left interior garage wall.

When was the EV charger permit filed?

The City of Dallas filed residential electrical permit RES-ELC-26-000903 on Feb. 16, 2026.

How much power will the EV charger use?

The permit describes a 60-amp circuit and says the charger will draw up to 48 amps continuously.

Where will the EV charger be installed at 8909 Flint Falls Dr?

The permit specifies the left interior wall of the garage. It describes routing the circuit from the exterior panel through the crawlspace into the garage.