Active · latest filing Oct 2026Residential
9209 Heatherdale Dr
Dallas, TX 75243
Roof and gutter replacement permitted at 9209 Heatherdale Dr
A residential permit filed October 9, 2026, covers removing and replacing the roof and gutters at 9209 Heatherdale Dr. The work is described as a like-kind replacement, not a new building.
Summarized from City of Dallas records · updated Oct 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 9, 2026
- since Oct 9, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9209 Heatherdale Dr
What work is permitted at 9209 Heatherdale Dr?
The permit covers removing and replacing the roof and gutters with like-kind materials.
When was the roof permit filed for 9209 Heatherdale Dr?
The City of Dallas permit was filed October 9, 2026.
What is the permit number for the work at 9209 Heatherdale Dr?
The residential roofing permit number is RES-ROOF-26-001749.
Is a new house being built at 9209 Heatherdale Dr?
The record describes roof and gutter replacement, not new home construction.
Does the permit list a project cost for 9209 Heatherdale Dr?
No project value is listed in the permit record.
Also being built nearby
All of 75243- 9208 Heatherdale DrApr 24, 2026Under slab sewer replacement · 13 m away
- 9214 Heatherdale DrJul 1, 20263 ton deluxe 80% gas system – horizontal · 21 m away
- 9219 Heatherdale DrDec 3, 2025Install 50 gallon gas water heater · 29 m away
- 9221 Heatherdale DrJul 9, 2026New elwctrical for addition · 35 m away
- 9220 Heatherdale DrJul 13, 2026Tunnel to repair main building sewer/ drain line · 35 m away
- 9222 Heatherdale DrJul 22, 2025This will be to replace sewer from house clean outs to city tap · 41 m away
- 9228 Heatherdale DrApr 2, 2026- includes demoing and hauling off your existing fence that is 148' long.- this quote is for installing a 148 feet long x 8 feet tall board on board wooden fence.- includes digging post holes 3 feet deep. posts will be spaced 6 feet apart.- each post will be installed in maximizer concrete.- posts will be 11’ steel post (but only 8 feet will be above ground)- fence will be vertical. install 1x6x8 pre stained's vertically to build board on board fence- includes installing 2x6x12 pre stained's as a top cap for the fence- includes installing steel post caps on top of all the posts- includes 1x4x8 pre stained trim installed as double trim.- includes 2x6x12 treated kick board along the base of the fence stacked one high and 2/3 high to re-build retaining wall.- includes installing 2 gate that are 36 · 57 m away
- 9208 Clover Valley DrMay 15, 2025Complete duct system replacement · 81 m away
- 9206 Clover Valley DrFeb 18, 2026I am replacing 40 feet of cast iron under the house · 81 m away
- 9212 Clover Valley DrNov 16, 2026Sister 36 lf of 2x6 beam.• reset/re-shim the entire pier and beam portion of the foundation with steel to improve leveling · 81 m away
- 9315 Dove Meadow DrAug 21, 2026Under slab sewer repipe · 87 m away
- 9215 Clover Valley DrDec 8, 2025Water repipe · 95 m away