9220 Heatherdale Dr
Dallas, TX 75243
Sewer repair tunnel permitted at 9220 Heatherdale Dr
A tunnel to repair the main building sewer and drain line is covered by a City of Dallas residential plumbing permit filed July 13, 2026. The permit record does not list a project valuation or square footage.
Summarized from City of Dallas records · updated Jul 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 13, 2026
- since Jul 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9220 Heatherdale Dr
What work is happening at 9220 Heatherdale Dr?
A City of Dallas permit describes a tunnel to repair the main building sewer and drain line. The permit was filed July 13, 2026.
When was the sewer repair permitted at 9220 Heatherdale Dr?
The permit was filed July 13, 2026.
What is the permit number for 9220 Heatherdale Dr?
The City of Dallas residential plumbing permit number is RES-PLM-26-007199. It was filed July 13, 2026.
Is a new home being built at 9220 Heatherdale Dr?
The available permit record describes sewer and drain-line repair work, not construction of a new home.
Does the permit list the cost of the sewer repair?
No valuation is listed in the permit record.
Also being built nearby
All of 75243- 9222 Heatherdale DrJul 22, 2025This will be to replace sewer from house clean outs to city tap · 6 m away
- 9221 Heatherdale DrJul 9, 2026New elwctrical for addition · 13 m away
- 9219 Heatherdale DrDec 3, 2025Install 50 gallon gas water heater · 14 m away
- 9214 Heatherdale DrJul 1, 20263 ton deluxe 80% gas system – horizontal · 16 m away
- 9228 Heatherdale DrApr 2, 2026- includes demoing and hauling off your existing fence that is 148' long.- this quote is for installing a 148 feet long x 8 feet tall board on board wooden fence.- includes digging post holes 3 feet deep. posts will be spaced 6 feet apart.- each post will be installed in maximizer concrete.- posts will be 11’ steel post (but only 8 feet will be above ground)- fence will be vertical. install 1x6x8 pre stained's vertically to build board on board fence- includes installing 2x6x12 pre stained's as a top cap for the fence- includes installing steel post caps on top of all the posts- includes 1x4x8 pre stained trim installed as double trim.- includes 2x6x12 treated kick board along the base of the fence stacked one high and 2/3 high to re-build retaining wall.- includes installing 2 gate that are 36 · 22 m away
- 9208 Heatherdale DrApr 24, 2026Under slab sewer replacement · 32 m away
- 9209 Heatherdale DrOct 9, 2026Remove and replace roof and gutters with like and kind · 35 m away
- 9315 Dove Meadow DrAug 21, 2026Under slab sewer repipe · 88 m away
- 9217 Middle Glen DrApr 10, 2026Hvac changeout: replace existing upstairs system with new 4-ton 18 seer gas horizontal split system; no structural change · 98 m away
- 9215 Middle Glen DrMay 5, 2026Replaced 50 gallon gas water heater in hall closet on first floor · 98 m away
- 9212 Clover Valley DrNov 16, 2026Sister 36 lf of 2x6 beam.• reset/re-shim the entire pier and beam portion of the foundation with steel to improve leveling · 102 m away
- 9233 Middle Glen DrOct 16, 2026Moved returns to ceiling · 104 m away