9218 Clover Valley Dr
Dallas, TX 75243
9218 Clover Valley Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 9218 Clover Valley Dr, Dallas, TX 75243. The most recent, filed November 18, 2026, covers: “Residential reroof of asphalt shingles approximately 40 sqs. no sheathing or framing needed”.
Compiled from City of Dallas records · updated Nov 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9218 Clover Valley Dr
What is being built at 9218 Clover Valley Dr?
The latest filing (City of Dallas permit RES-ROOF-26-002000, November 18, 2026) covers residential reroof of asphalt shingles approximately 40 sqs. no sheathing or framing needed.
How many permits and filings does 9218 Clover Valley Dr have?
1 filing across 1 project, from November 18, 2026 to November 18, 2026.
Is there other construction near 9218 Clover Valley Dr?
Yes. Nearby filings include 9506 Mill Hollow Dr (repair cold water leak via 5ft exterior tunnel, Jan 30, 2026); 9408 Mill Hollow Dr (replace 4 ton complete, May 27, 2025); 9406 Mill Hollow Dr (gas test and repair, Feb 11, 2026).
How do I get alerts for new permits at 9218 Clover Valley Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75243- 9506 Mill Hollow DrJan 30, 2026Repair cold water leak via 5ft exterior tunnel · 103 m away
- 9408 Mill Hollow DrMay 27, 2025Replace 4 ton complete · 113 m away
- 9406 Mill Hollow DrFeb 11, 2026Gas test and repair · 113 m away
- 9221 Alta Oaks DrSep 22, 2025Replace 5 ton gas hvac unit · 125 m away
- 9228 Heatherdale DrApr 2, 2026- includes demoing and hauling off your existing fence that is 148' long.- this quote is for installing a 148 feet long x 8 feet tall board on board wooden fence.- includes digging post holes 3 feet deep. posts will be spaced 6 feet apart.- each post will be installed in maximizer concrete.- posts will be 11’ steel post (but only 8 feet will be above ground)- fence will be vertical. install 1x6x8 pre stained's vertically to build board on board fence- includes installing 2x6x12 pre stained's as a top cap for the fence- includes installing steel post caps on top of all the posts- includes 1x4x8 pre stained trim installed as double trim.- includes 2x6x12 treated kick board along the base of the fence stacked one high and 2/3 high to re-build retaining wall.- includes installing 2 gate that are 36 · 127 m away
- 9221 Heatherdale DrJul 9, 2026New elwctrical for addition · 134 m away
- 9219 Heatherdale DrDec 3, 2025Install 50 gallon gas water heater · 138 m away
- 9222 Heatherdale DrJul 22, 2025This will be to replace sewer from house clean outs to city tap · 139 m away
- 9220 Heatherdale DrJul 13, 2026Tunnel to repair main building sewer/ drain line · 143 m away
- 9215 Clover Valley DrDec 8, 2025Water repipe · 155 m away
- 9214 Heatherdale DrJul 1, 20263 ton deluxe 80% gas system – horizontal · 155 m away
- 9212 Clover Valley DrNov 16, 2026Sister 36 lf of 2x6 beam.• reset/re-shim the entire pier and beam portion of the foundation with steel to improve leveling · 156 m away