9503 Forest Ln
Dallas, TX 75243
TxDOT highway camera electrical service permitted on Forest Ln
A TxDOT electrical service for a highway camera was permitted in the public right of way in front of 9503 Forest Ln on June 30, 2025. The permit record describes the work as outside the property.
Summarized from City of Dallas records · updated Jun 30, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 30, 2025
- since Jun 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9503 Forest Ln
What is being built at 9503 Forest Ln in Dallas?
A City of Dallas permit describes electrical service for a TxDOT highway camera in the public right of way in front of the address. It was filed June 30, 2025, under permit COM-ELC-25-000623.
Is a new building being built at 9503 Forest Ln?
The permit record is for electrical service for a highway camera, not a building project. It says the work is in the public right of way in front of the property.
Who is the permit for at 9503 Forest Ln?
The permit description identifies the work as TxDOT electrical service for a highway camera. It does not name a property occupant or owner.
When was the highway camera electrical permit filed?
The City of Dallas permit was filed June 30, 2025. Its permit number is COM-ELC-25-000623.
Is the highway camera work on the property at 9503 Forest Ln?
The permit description says the work is in the right of way in front of the property, not on the property itself.
Also being built nearby
All of 75243- 9501 Forest LnFeb 16, 2026Replaced 1-1/2" watts 007m2 sn: 34294with new backflow sn: ak10989 · 35 m away
- 9500 Forest LnOct 28, 2026Mcr closing off 3 side entry doors and changing the hardware on a 4th side door · 50 m away
- 9480 Forest LnJul 30, 2025Txdot electrical service for hwy camera · 237 m away
- 9550 Forest LnFeb 18, 20261. install 3 motion sensors.2. install 2 -110 outlets · 248 m away
- 9535 Forest LnApr 22, 2026Fix roof leak by replacing area with new shingles · 286 m away
- 9467 L B J FwyOct 30, 2026Zo bc el fire existing cell tower compound - install (4) charles cpad-xfrakit unitsinstall (1) 12'-0" h-frameinstall (2) span panelsinstall (4) new tesla powerwall 3 unitsinstall (2) new tesla gateway 3 unitsinstall (4) shutdown switchesinstall (1) charles fiber box (cube-m01818wb-a)install (2) 200a meters in existing meter boxesinstall (4) nodesinstall (1) ground barinstall conduit runs from the h-frame to the nodesinstall fiber handholes (final quantity to be determined by contractor) · 297 m away
- 9489 Timberleaf DrFeb 21, 2023Residential new construction 9489 timberleaf dr · 370 m away
- 9487 Timberleaf DrFeb 21, 2023Residential new construction 9487 timberleaf · 371 m away
- 9485 Timberleaf DrFeb 17, 2023Residential new construction 9485 timberleaf dr · 372 m away
- 9483 Timberleaf DrFeb 21, 2023Residential new construction 9483 timberleaf dr · 374 m away
- 9481 Timberleaf DrFeb 23, 20249481 timberleaf dr · 376 m away
- 9607 Arborhill DrAug 6, 2026Install 40 gallon gas water heater in garage closet (swap out) · 378 m away