4534 Allencrest Ln
Dallas, TX 75244
4534 Allencrest Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 4534 Allencrest Ln, Dallas, TX 75244. The most recent, filed October 12, 2020, covers: “Gas relay or repair with test”.
Compiled from City of Dallas records · updated Oct 12, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 12, 2020
- since Oct 12, 2020
- Largest scope
- —
- Listed value
- $88
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 4534 Allencrest Ln
What is being built at 4534 Allencrest Ln?
The latest filing (City of Dallas permit 2010123070, October 12, 2020) covers gas relay or repair with test.
How many permits and filings does 4534 Allencrest Ln have?
1 filing across 1 project, from October 12, 2020 to October 12, 2020.
How much is the construction at 4534 Allencrest Ln worth?
Permits at this address list about $88 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 4534 Allencrest Ln?
Yes. Nearby filings include 4535 Allencrest Ln (residential new construction, Dec 1, 2025); 4518 Allencrest Ln (changing overhead service to underground. dig from existing power pole to current meter location on the side of the house. install 2" conduit in ground and stub up at both the power pole and at current meter location. install new meter socket at existing location. remove existing overhead service riser, Jul 2, 2026); 4545 Mendenhall Dr (replace 175 feet of cast iron sewer line under the house, Apr 24, 2026).
How do I get alerts for new permits at 4534 Allencrest Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75244- 4535 Allencrest LnDec 1, 2025Residential new construction · 13 m away
- 4518 Allencrest LnJul 2, 2026Changing overhead service to underground. dig from existing power pole to current meter location on the side of the house. install 2" conduit in ground and stub up at both the power pole and at current meter location. install new meter socket at existing location. remove existing overhead service riser · 33 m away
- 4545 Mendenhall DrApr 24, 2026Replace 175 feet of cast iron sewer line under the house · 89 m away
- 4535 Mendenhall DrSep 25, 2025Repipe · 97 m away
- 4525 Mendenhall DrJan 29, 20263 ton deluxe hp electric system horizontal · 108 m away
- 4528 Mendenhall DrSep 21, 2026Water repipe interior · 114 m away
- 4518 Nashwood LnMar 4, 2026Replace water heater · 126 m away
- 4527 Nashwood LnOct 7, 2025Replace 5 ton complete · 135 m away
- 4511 Nashwood LnJun 2, 2025Installation of a 26kw backup generator · 143 m away
- 4608 Allencrest LnFeb 9, 2026Run gas line to pool heater · 154 m away
- 4631 Allencrest LnMay 18, 2026Install 4 ton condenser and coil for upstairs · 186 m away
- 4608 Nashwood LnJan 19, 2021Gas test · 194 m away