4535 Allencrest Ln
Dallas, TX 75244
Residential new-construction permits at 4535 Allencrest Ln
City of Dallas permits indicate residential new construction at 4535 Allencrest Ln, including a new plumbing system and electrical work. The plumbing permit was filed September 29, 2025, and the electrical permit was filed December 1, 2025.
Summarized from City of Dallas records · updated Dec 1, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 1, 2025
- since Sep 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 4535 Allencrest Ln
What is being built at 4535 Allencrest Ln?
City of Dallas records show residential new-construction electrical work and installation of a new plumbing system at this address.
When were permits filed for 4535 Allencrest Ln?
The plumbing permit was filed September 29, 2025, and the electrical permit was filed December 1, 2025.
Is a new house being built at 4535 Allencrest Ln in Dallas?
The City of Dallas issued a residential electrical permit described as residential new construction, along with a permit to install a new plumbing system. The records do not provide further details about the building.
What does permit RES-ELC-25-004813 cover?
The City of Dallas electrical permit, filed December 1, 2025, is described as residential new construction.
What does permit RES-PLM-25-005466 cover?
The City of Dallas plumbing permit, filed September 29, 2025, covers installation of a new plumbing system.
Also being built nearby
All of 75244- 4534 Allencrest LnOct 12, 2020Gas relay or repair with test · 13 m away
- 4518 Allencrest LnJul 2, 2026Changing overhead service to underground. dig from existing power pole to current meter location on the side of the house. install 2" conduit in ground and stub up at both the power pole and at current meter location. install new meter socket at existing location. remove existing overhead service riser · 35 m away
- 4545 Mendenhall DrApr 24, 2026Replace 175 feet of cast iron sewer line under the house · 101 m away
- 4535 Mendenhall DrSep 25, 2025Repipe · 108 m away
- 4518 Nashwood LnMar 4, 2026Replace water heater · 113 m away
- 4525 Mendenhall DrJan 29, 20263 ton deluxe hp electric system horizontal · 118 m away
- 4527 Nashwood LnOct 7, 2025Replace 5 ton complete · 122 m away
- 4528 Mendenhall DrSep 21, 2026Water repipe interior · 125 m away
- 4511 Nashwood LnJun 2, 2025Installation of a 26kw backup generator · 131 m away
- 4608 Allencrest LnFeb 9, 2026Run gas line to pool heater · 155 m away
- 4631 Allencrest LnMay 18, 2026Install 4 ton condenser and coil for upstairs · 186 m away
- 4608 Nashwood LnJan 19, 2021Gas test · 186 m away