408 Josephine St
Dallas, TX 75246
Foundation repair and plumbing work at 408 Josephine St
City of Dallas permits indicate residential foundation repair and plumbing work at 408 Josephine St, rather than a new building. The plumbing permit was filed August 20, 2025, and the foundation repair permit followed on August 25, 2025.
Summarized from City of Dallas records · updated Aug 25, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 25, 2025
- since Aug 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 408 Josephine St
What is being built at 408 Josephine St in Dallas?
The City of Dallas records show residential foundation repair and plumbing work, not a new building. The permits were filed August 20 and August 25, 2025.
Is a new home being built at 408 Josephine St?
The available permits do not indicate new home construction. They cover foundation repair and a plumbing installation.
What foundation work is planned at 408 Josephine St?
Permit RES-FDN-25-000337, filed August 25, 2025, describes seven hybrid piers and an exterior concrete breakout and repatch.
What plumbing work is planned at 408 Josephine St?
Permit RES-PLM-25-003931, filed August 20, 2025, describes installation of a double cleanout.
When were permits filed for 408 Josephine St?
The plumbing permit was filed August 20, 2025, and the residential foundation repair permit was filed August 25, 2025.
Also being built nearby
All of 75246- 420 Josephine StJan 9, 2026Reroof · 12 m away
- 460 Josephine StDec 7, 2020Install new hvac · 52 m away
- 528 Josephine StJun 12, 2025Changing the upstairs pancake air handlerdownstairs system you will be changing the condenser and the air handler · 120 m away
- 535 Josephine StMay 16, 2025Replacing indoor pancake unit and condenser · 126 m away
- 323 Alcalde StJul 31, 2025Gas turned off · 231 m away
- 301 Alcalde StJun 22, 2026Installing 2qty complete electric systems including ductwork · 241 m away
- 4127 Elm StJun 3, 2026The electrical scope of work is as follows: 3. phase 3 – in edbof a. installation of disconnect for bay 32 and 35 b. demolition of 1 ea bay c. installation of branch wiring for disconnects as listed in 3.a d. installation of conduit and electrical connection between disconnect, control console, and pit · 241 m away
- 200 N Peak StOct 10, 2025Mcr the work will include removal of a portion of a double t-beam on a parking structure ramp. this ramp leads from the 1st floor to the second floor and is the last double t-beam connecting to the second floor. contractor will saw cut a portion of the double t-beam's flange at the full length and depth of the t-beam. contractor will then form the the section, install new expansion joint, new rebar into existing beam and adjacent beam. once all formed and rebar in place, contractor will pour the new flange portion · 251 m away
- 436 N Hill AveJul 28, 2026Removal of existing hvac system and installation of new hvac system · 257 m away
- 424 N Hill AveJul 9, 2026Electric water heater replacement in the attic · 257 m away
- 4014 Simpson StOct 8, 2026Temp stage 15 x 35 · 257 m away
- 4312 Elm StOct 12, 2020Gas relay or repair with test · 268 m away