323 Alcalde St
Dallas, TX 75246
323 Alcalde St: 1 project on record
City of Dallas lists 1 filing across 1 project at 323 Alcalde St, Dallas, TX 75246. The most recent, filed July 31, 2025, covers: “Gas turned off”.
Compiled from City of Dallas records · updated Jul 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 31, 2025
- since Jul 31, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 323 Alcalde St
What is being built at 323 Alcalde St?
The latest filing (City of Dallas permit RES-PLM-25-003191, July 31, 2025) covers gas turned off.
How many permits and filings does 323 Alcalde St have?
1 filing across 1 project, from July 31, 2025 to July 31, 2025.
What is being built near Leverage Square 67, in Dallas?
323 Alcalde St is about 140 m from Leverage Square 67, (4420 Elm Street). Its latest filing is for gas turned off.
Is there other construction near 323 Alcalde St?
Yes. Nearby filings include 301 Alcalde St (installing 2qty complete electric systems including ductwork, Jun 22, 2026); 4405 Elm St (gas test, Oct 5, 2020); 4411 Elm St (electrical no work. need service release, Mar 20, 2026).
How do I get alerts for new permits at 323 Alcalde St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75246- 301 Alcalde StJun 22, 2026Installing 2qty complete electric systems including ductwork · 22 m away
- 4405 Elm StOct 5, 2020Gas test · 125 m away
- 4411 Elm StMar 20, 2026Electrical no work. need service release · 126 m away
- 4503 Reiger AveMar 26, 2026Installation of new decorative metal fence with masonry columns/cast stone caps at the front of the property, a 7-foot board-on-board wood privacy fencing at side and rear property lines, and an 8-foot sliding driveway gate · 131 m away
- 4502 Reiger AveOct 6, 2026Hvac equipment change out, units only · 134 m away
- 4406 Elm StJan 27, 2026Gas test · 138 m away
- 4420 Elm Street · Leverage Square 67, LPJul 5, 2024Vault 17 — renovation/alteration — renovate existing tenant space for new use as a bar · 140 m away
- 200 N Peak StOct 10, 2025Mcr the work will include removal of a portion of a double t-beam on a parking structure ramp. this ramp leads from the 1st floor to the second floor and is the last double t-beam connecting to the second floor. contractor will saw cut a portion of the double t-beam's flange at the full length and depth of the t-beam. contractor will then form the the section, install new expansion joint, new rebar into existing beam and adjacent beam. once all formed and rebar in place, contractor will pour the new flange portion · 159 m away
- 4312 Elm StOct 12, 2020Gas relay or repair with test · 162 m away
- 4526 Victor StOct 9, 2020Driveway approach · 191 m away
- 4530 Victor StSep 29, 2020Install swimming pool · 196 m away
- 111 N Carroll AveAug 26, 2025Sow is to install bollards around the store to protect the customers from vehicular traffic · 208 m away