4405 Elm St
Dallas, TX 75226
4405 Elm St: 1 project on record
City of Dallas lists 1 filing across 1 project at 4405 Elm St, Dallas, TX 75226. The most recent, filed October 5, 2020, covers: “Gas test”.
Compiled from City of Dallas records · updated Oct 5, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 5, 2020
- since Oct 5, 2020
- Largest scope
- —
- Listed value
- $185
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 4405 Elm St
What is being built at 4405 Elm St?
The latest filing (City of Dallas permit 2010053041, October 5, 2020) covers gas test.
How many permits and filings does 4405 Elm St have?
1 filing across 1 project, from October 5, 2020 to October 5, 2020.
How much is the construction at 4405 Elm St worth?
Permits at this address list about $185 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Leverage Square 67, in Dallas?
4405 Elm St is about 20 m from Leverage Square 67, (4420 Elm Street). Its latest filing is for gas test.
Is there other construction near 4405 Elm St?
Yes. Nearby filings include 4411 Elm St (electrical no work. need service release, Mar 20, 2026); 4406 Elm St (gas test, Jan 27, 2026); 4420 Elm Street (vault 17 — renovation/alteration — renovate existing tenant space for new use as a bar, Jul 5, 2024).
How do I get alerts for new permits at 4405 Elm St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75226- 4411 Elm StMar 20, 2026Electrical no work. need service release · 6 m away
- 4406 Elm StJan 27, 2026Gas test · 13 m away
- 4420 Elm Street · Leverage Square 67, LPJul 5, 2024Vault 17 — renovation/alteration — renovate existing tenant space for new use as a bar · 20 m away
- 301 Alcalde StJun 22, 2026Installing 2qty complete electric systems including ductwork · 103 m away
- 4312 Elm StOct 12, 2020Gas relay or repair with test · 103 m away
- 111 N Carroll AveAug 26, 2025Sow is to install bollards around the store to protect the customers from vehicular traffic · 107 m away
- 200 N Peak StOct 10, 2025Mcr the work will include removal of a portion of a double t-beam on a parking structure ramp. this ramp leads from the 1st floor to the second floor and is the last double t-beam connecting to the second floor. contractor will saw cut a portion of the double t-beam's flange at the full length and depth of the t-beam. contractor will then form the the section, install new expansion joint, new rebar into existing beam and adjacent beam. once all formed and rebar in place, contractor will pour the new flange portion · 114 m away
- 4409 Main StNov 26, 2025Gas pressure test for gas provider.no work performed · 118 m away
- 4417 Main StOct 5, 2026Zo bc carportrecord sitepr-26-000044: · 119 m away
- 323 Alcalde StJul 31, 2025Gas turned off · 125 m away
- 4502 Reiger AveOct 6, 2026Hvac equipment change out, units only · 139 m away
- 132 N Peak StAug 13, 2025Install 40 gallon electric water heater in ceiling above restroom · 145 m away