4406 Elm St
Dallas, TX 75226
Commercial plumbing permit for gas test at 4406 Elm St
A commercial plumbing permit for a gas test at 4406 Elm St was filed on January 27, 2026. The record does not describe a new building or specify other work.
Summarized from City of Dallas records · updated Jan 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 27, 2026
- since Jan 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4406 Elm St
What is being built at 4406 Elm St in Dallas?
The available record is for a commercial plumbing gas test, not a new building. It does not specify other construction.
What work is planned at 4406 Elm St?
A City of Dallas commercial plumbing permit lists a gas test. The record does not provide further details.
When was the permit filed for 4406 Elm St?
The permit was filed on January 27, 2026.
What is the permit number for 4406 Elm St?
The permit number is COM-PLM-26-000241. It is a commercial plumbing permit for a gas test.
Is a new business opening at 4406 Elm St?
The permit record does not identify a business or indicate that one is opening. It lists only a commercial plumbing gas test.
Also being built nearby
All of 75226- 4405 Elm StOct 5, 2020Gas test · 13 m away
- 4411 Elm StMar 20, 2026Electrical no work. need service release · 13 m away
- 4420 Elm Street · Leverage Square 67, LPJul 5, 2024Vault 17 — renovation/alteration — renovate existing tenant space for new use as a bar · 14 m away
- 111 N Carroll AveAug 26, 2025Sow is to install bollards around the store to protect the customers from vehicular traffic · 99 m away
- 4312 Elm StOct 12, 2020Gas relay or repair with test · 104 m away
- 4409 Main StNov 26, 2025Gas pressure test for gas provider.no work performed · 105 m away
- 4417 Main StOct 5, 2026Zo bc carportrecord sitepr-26-000044: · 106 m away
- 301 Alcalde StJun 22, 2026Installing 2qty complete electric systems including ductwork · 116 m away
- 200 N Peak StOct 10, 2025Mcr the work will include removal of a portion of a double t-beam on a parking structure ramp. this ramp leads from the 1st floor to the second floor and is the last double t-beam connecting to the second floor. contractor will saw cut a portion of the double t-beam's flange at the full length and depth of the t-beam. contractor will then form the the section, install new expansion joint, new rebar into existing beam and adjacent beam. once all formed and rebar in place, contractor will pour the new flange portion · 117 m away
- 4424 Main StDec 18, 2025No layout changes · 133 m away
- 4434 Main StSep 2, 2026Install water heater · 133 m away
- 323 Alcalde StJul 31, 2025Gas turned off · 138 m away