4420 Elm Street
Dallas, TX 75204 · Leverage Square 67, LP
Vault 17 bar renovation registered at 4420 Elm Street
A 2,210-square-foot existing tenant space at 4420 Elm Street is being renovated for use as a bar named Vault 17. The project was registered with the Texas Department of Licensing and Regulation on July 5, 2024; its status is listed as Review Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 5, 2024
- since Jul 5, 2024
- Largest scope
- 2,210 sf
- Estimated cost
- $50K
- state registration
Where this project stands
Finishing up · inspection nextVault 17
2,210 sq ft · $50K est.
- RegisteredJul 5, 2024
- Plan review
- ConstructionJul '24 – Sep '24
- Inspectednow
- Closed
Scheduled to finish Sep 10, 2024; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovate existing tenant space for new use as a bar — vault 17
TDLR project registrationRenovation/AlterationReview Complete2,210 sq ft$50K est.- Project #
- TABS2024022435
- Tenant / owner
- Vault 17
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4420 Elm Street
What is being built at 4420 Elm Street in Dallas?
A 2,210-square-foot existing tenant space is being renovated for use as a bar named Vault 17, according to a TDLR registration dated July 5, 2024.
Is a new bar opening at 4420 Elm Street?
The TDLR project description says the existing tenant space is being renovated for a new use as a bar. The record does not give an opening date.
When was the Vault 17 project at 4420 Elm Street filed?
The project registration was filed on July 5, 2024, under TDLR number TABS2024022435.
How large is the Vault 17 renovation in Dallas?
The registered project covers 2,210 square feet of existing tenant space.
What is the estimated cost of the Vault 17 project?
The TDLR registration lists an estimated project cost of $50,000. This is the applicant's estimate, not a confirmed final cost.
What is the status of the Vault 17 project?
The TDLR project registration lists the status as Review Complete.
Also being built nearby
All of 75204- 4406 Elm StJan 27, 2026Gas test · 14 m away
- 4411 Elm StMar 20, 2026Electrical no work. need service release · 16 m away
- 4405 Elm StOct 5, 2020Gas test · 20 m away
- 111 N Carroll AveAug 26, 2025Sow is to install bollards around the store to protect the customers from vehicular traffic · 87 m away
- 4417 Main StOct 5, 2026Zo bc carportrecord sitepr-26-000044: · 105 m away
- 4409 Main StNov 26, 2025Gas pressure test for gas provider.no work performed · 105 m away
- 4312 Elm StOct 12, 2020Gas relay or repair with test · 118 m away
- 301 Alcalde StJun 22, 2026Installing 2qty complete electric systems including ductwork · 119 m away
- 200 N Peak StOct 10, 2025Mcr the work will include removal of a portion of a double t-beam on a parking structure ramp. this ramp leads from the 1st floor to the second floor and is the last double t-beam connecting to the second floor. contractor will saw cut a portion of the double t-beam's flange at the full length and depth of the t-beam. contractor will then form the the section, install new expansion joint, new rebar into existing beam and adjacent beam. once all formed and rebar in place, contractor will pour the new flange portion · 131 m away
- 4424 Main StDec 18, 2025No layout changes · 133 m away
- 4434 Main StSep 2, 2026Install water heater · 135 m away
- 4502 Reiger AveOct 6, 2026Hvac equipment change out, units only · 136 m away
More restaurants in 75204.