1011 Regal Row
Dallas, TX 75247
Sewer reroute and gas test permits at 1011 Regal Row
City of Dallas permits at 1011 Regal Row cover a sewer-system repair and reroute, permitted September 4, 2025, and a gas test, permitted December 16, 2025. The records do not describe a new building or provide a project cost.
Summarized from City of Dallas records · updated Dec 16, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Dec 16, 2025
- since Jan 13, 2021
- Largest scope
- —
- Listed value
- $46K
- partial · often understated
Permit & project history
4 projectsInstalling new sprinkler riser assemblies, demolish and cap off the existing riser assemblies and re
Installing new sprinkler riser assemblies, demolish and cap off the existing riser assemblies and re
City of Dallas permitFire Sprinkler (Major Work) (FI) Commercial Alteration$45K
Sources: City of Dallas
Questions about 1011 Regal Row
What is being built at 1011 Regal Row?
The City of Dallas records describe plumbing work: a sewer-system repair and reroute, followed by a gas test. They do not describe new construction.
What work is planned at 1011 Regal Row in Dallas?
A September 4, 2025 permit covers a sewer-system repair and reroute. A December 16, 2025 permit is for a gas test.
When were permits filed for 1011 Regal Row?
The City of Dallas records show filings on September 4 and December 16, 2025.
What is permit COM-PLM-25-001543 for?
City of Dallas permit COM-PLM-25-001543, dated September 4, 2025, is for repairing and rerouting the sewer system at 1011 Regal Row.
What is permit COM-PLM-25-003201 for?
City of Dallas permit COM-PLM-25-003201, dated December 16, 2025, is for a gas test at 1011 Regal Row.
Also being built nearby
All of 75247- 1055 Regal RowOct 23, 2026Install new 200a service for new pole sign · 52 m away
- 999 Regal RowOct 27, 2020Replace section of sewer inside warehouse · 187 m away
- 9207 Ambassador RowSep 2, 20251 access hole in dirt, 5 feet of tunnel to repair existing 1 inch copper water line · 188 m away
- 9235 John W Carpenter FwyFeb 3, 2026Adding two fryers and relocate some outlets on two kitchen walls · 211 m away
- 9100 John W Carpenter FwyDec 30, 2020Alcohol certification · 258 m away
- 9200 John W Carpenter FwyOct 22, 2026Roof recover. no structural changes. remove all penetration flashings, curb flashings & wall flashings for the new roof installation.. over the existing roof, furnish & install a gaf, white 60-mil, tpo fleece-back membrane, mechanically attached · 271 m away
- 1111 Regal RowJan 5, 2026Build fence · 299 m away
- 909 Regal RowJul 9, 2026Plumbing work above ground onlywe are not touching gas lines we might do a pressure test if needed · 307 m away
- 9109 John W Carpenter FwySep 10, 2026Alteration to replace existing rotted wood on windows, connect all plumbing fixtures, seal all cracks and holes in building, remove gutters, roof stairs need support, also need to get addition that was built previously inspected as apparently there are no permits for this addition · 351 m away
- 1141 Regal RowMar 31, 2026Commercial plumbing permit · 351 m away
- 9101 John W Carpenter FwyNov 11, 2020Install water heater · 361 m away
- 9004 Ambassador Row · Ambassador Holdings, LLCJul 2, 2026Add 4 inch one way clean.outs on main sewer line towards city tap roughly 60 feet away from main clean out and spot repair on broken line at clean out in same location · 420 m away