9101 John W Carpenter Fwy
Dallas, TX 75247
9101 John W Carpenter Fwy: 3 projects on record
City of Dallas lists 3 filings across 3 projects at 9101 John W Carpenter Fwy, Dallas, TX 75247 since November 2, 2020. The most recent, filed November 11, 2020, covers: “Install water heater”.
Compiled from City of Dallas records · updated Nov 11, 2020
- Projects
- 3
- 3 filings
- Latest filing
- Nov 11, 2020
- since Nov 2, 2020
- Largest scope
- —
- Listed value
- $1K
- partial · often understated
Permit & project history
3 projectsSources: City of Dallas
Questions about 9101 John W Carpenter Fwy
What is being built at 9101 John W Carpenter Fwy?
The latest filing (City of Dallas permit 2011113059, November 11, 2020) covers install water heater.
How many permits and filings does 9101 John W Carpenter Fwy have?
3 filings across 3 projects, from November 2, 2020 to November 11, 2020.
How much is the construction at 9101 John W Carpenter Fwy worth?
Permits at this address list about $1K in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Ambassador Holdings, in Dallas?
9101 John W Carpenter Fwy is about 252 m from Ambassador Holdings, (9004 Ambassador Row). Its latest filing is for install water heater.
Is there other construction near 9101 John W Carpenter Fwy?
Yes. Nearby filings include 9109 John W Carpenter Fwy (alteration to replace existing rotted wood on windows, connect all plumbing fixtures, seal all cracks and holes in building, remove gutters, roof stairs need support, also need to get addition that was built previously inspected as apparently there are no permits for this addition, Sep 10, 2026); 9011 John W Carpenter Fwy (gas test, Dec 11, 2025); 9235 John W Carpenter Fwy (adding two fryers and relocate some outlets on two kitchen walls, Feb 3, 2026).
How do I get alerts for new permits at 9101 John W Carpenter Fwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75247- 9109 John W Carpenter FwySep 10, 2026Alteration to replace existing rotted wood on windows, connect all plumbing fixtures, seal all cracks and holes in building, remove gutters, roof stairs need support, also need to get addition that was built previously inspected as apparently there are no permits for this addition · 10 m away
- 9011 John W Carpenter FwyDec 11, 2025Gas test · 111 m away
- 9235 John W Carpenter FwyFeb 3, 2026Adding two fryers and relocate some outlets on two kitchen walls · 166 m away
- 8918 John W Carpenter FwyOct 2, 2020Service release no work · 233 m away
- 9004 Ambassador Row · Ambassador Holdings, LLCJul 2, 2026Add 4 inch one way clean.outs on main sewer line towards city tap roughly 60 feet away from main clean out and spot repair on broken line at clean out in same location · 252 m away
- 8900 John W Carpenter FwyMay 16, 2025Scope of work: replace wire that was stolen by thieves · 271 m away
- 9003 Governors RowApr 16, 2026Clean and show · 294 m away
- 9011 Governors RowJul 8, 2025Install 590' of 6' tall two rail press point iron fence. 1- 6'x20' slide gate, 1- 6'x38' slide gate on vee track. new posts. all fence with black powder coated finish · 296 m away
- 9029 Governors RowApr 9, 20266' black vinyl chain link with 3 strands of barb wire(796')3" dq 40 corner post. 2 3/8" dq 40 line post. 1 5/8" dq 40 top rail. 9ga vinyl coated fabric. 8 1/4" vinyl coated fence ties, 9ga. 9ga vinyl coated hog rings. 9ga tension wire. all corner post and brace post to be set in the ground 24" - 30" in 3500psi concrete dry mix. includes all material and labor.chain link double drive gate - 44'- manual, chain link double drive gate 22'- manual · 309 m away
- 8911 Governors RowAug 26, 2026Cast iron sewer replacement under slab with trench · 315 m away
- 1208 Viceroy Drive · Cantex Bh Viceroy LLCDec 22, 2025Avis budget group / waymo maintenance facility tenant improvement — renovation/alteration — renovate existing building and site for self-driving taxi maintenance facility to include: level 2 ev chargers, dumpster, vehicle ramps, canopies and guard booths. interior shall include revised office space layout, vehicle lifts, breakroom · 321 m away
- 1208 Viceroy DrSep 2, 2026Electrical for new generator · 321 m away