Gas test permit filed at 9011 John W Carpenter Fwy
A commercial plumbing permit for a gas test was filed at 9011 John W Carpenter Fwy on December 11, 2025. The City of Dallas record lists permit COM-PLM-25-003132.
Summarized from City of Dallas records · updated Dec 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 11, 2025
- since Dec 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9011 John W Carpenter Fwy
What is being built at 9011 John W Carpenter Fwy?
The City of Dallas record lists a commercial plumbing permit for a gas test, filed December 11, 2025. It does not describe a new building.
What work does permit COM-PLM-25-003132 cover?
The permit description is “Gas test.” The record does not provide additional scope details.
When was the gas test permit filed at 9011 John W Carpenter Fwy?
It was filed on December 11, 2025.
Is there a permit number for work at 9011 John W Carpenter Fwy?
Yes. The City of Dallas permit number is COM-PLM-25-003132.
What's happening near the Avis Budget Group / Waymo Maintenance Facility?
At 9011 John W Carpenter Fwy, about 307 meters from the listed facility, the City of Dallas recorded a commercial plumbing permit for a gas test on December 11, 2025. The records do not indicate a connection between the two projects.
Also being built nearby
All of 75247- 9101 John W Carpenter FwyNov 11, 2020Install water heater · 111 m away
- 9109 John W Carpenter FwySep 10, 2026Alteration to replace existing rotted wood on windows, connect all plumbing fixtures, seal all cracks and holes in building, remove gutters, roof stairs need support, also need to get addition that was built previously inspected as apparently there are no permits for this addition · 121 m away
- 8918 John W Carpenter FwyOct 2, 2020Service release no work · 149 m away
- 8900 John W Carpenter FwyMay 16, 2025Scope of work: replace wire that was stolen by thieves · 178 m away
- 9004 Ambassador Row · Ambassador Holdings, LLCJul 2, 2026Add 4 inch one way clean.outs on main sewer line towards city tap roughly 60 feet away from main clean out and spot repair on broken line at clean out in same location · 251 m away
- 8908 Ambassador RowJun 17, 2025Re-roof - no structural changes.remove existing roof system, down to the steel deck. install (2) layers of 2.2" insulation. install gaf, white, tpo, 60-mil roof system, mechanically attached · 273 m away
- 9235 John W Carpenter FwyFeb 3, 2026Adding two fryers and relocate some outlets on two kitchen walls · 277 m away
- 8911 Governors RowAug 26, 2026Cast iron sewer replacement under slab with trench · 291 m away
- 1208 Viceroy DrSep 2, 2026Electrical for new generator · 307 m away
- 1208 Viceroy Drive · Cantex Bh Viceroy LLCDec 22, 2025Avis budget group / waymo maintenance facility tenant improvement — renovation/alteration — renovate existing building and site for self-driving taxi maintenance facility to include: level 2 ev chargers, dumpster, vehicle ramps, canopies and guard booths. interior shall include revised office space layout, vehicle lifts, breakroom · 307 m away
- 1215 Viceroy DrJul 14, 2026Repair service entrance due to vandalism · 316 m away
- 8901 Governors RowAug 13, 2026Service upgrade repair 200-amp 3 phase 4 wire delta · 321 m away