Roof membrane replacement permitted at 2949 N Stemmons Fwy
A commercial roofing permit indicates that the existing roof membrane at 2949 N Stemmons Fwy will be removed and replaced with a 60-mil TPO membrane system. The City of Dallas permit, COM-ROOF-26-000223, was filed on August 26, 2026.
Summarized from City of Dallas records · updated Aug 26, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 26, 2026
- since Aug 26, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2949 N Stemmons Fwy
What is being built at 2949 N Stemmons Fwy?
A City of Dallas commercial roofing permit indicates that the existing roof membrane will be replaced with a 60-mil TPO membrane system. The permit was filed August 26, 2026.
Is a new building going up at 2949 N Stemmons Fwy?
The available permit is for roof replacement, not new construction. It describes removing the existing membrane and installing a 60-mil TPO system.
When was the roof work at 2949 N Stemmons Fwy permitted?
The City of Dallas filed commercial roofing permit COM-ROOF-26-000223 on August 26, 2026.
What kind of roof is being installed at 2949 N Stemmons Fwy?
The permit description specifies a 60-mil TPO membrane system. It also says the existing roof membrane will be torn off.
What work is happening near Trinity Towers Level 3 Relocation - Brookriver?
A roof replacement was permitted at 2949 N Stemmons Fwy, about 351 meters from the listed Trinity Towers project. The permit was filed August 26, 2026.
Also being built nearby
All of 75247- 2910 N Stemmons FwyJun 13, 2025Exterior trench excavation up to 35 linear feet at front drive. replace drive main sewer main with schedule 40 pvc. backfill excavation and reinstate concrete · 94 m away
- 2929 N Stemmons FwyNov 5, 2020Upgrade existing electrical service · 125 m away
- 2979 N Stemmons FwyMar 12, 2026Rpz installation · 139 m away
- 2948 N Stemmons FwyNov 6, 20252 existing layers of roll roofing will be removed down to the deck and new 60mil tpo will be installed. new taper insulation system will be installed 1/4" on 12 slope. all new pitch pans, pipe boots, and t joint patches. *interior of building has an existing r-30 spray foam and gypsum board ceiling · 163 m away
- 2929 Irving BlvdJan 9, 2026Electrical work for commercial project · 191 m away
- 1558 Inwood RdOct 16, 2026Txdot project csj#0196-03-293 (electrical service for roadway illumination) · 214 m away
- 1521 Inwood RdJan 20, 2021Erect detached sign · 223 m away
- 1607 Inwood RdOct 22, 2026Replace the rpz valve · 224 m away
- 1550 Briar Cliff RdAug 12, 2025Nsfaa-(duplex)-1548/1550 briar cliff rd · 265 m away
- 1534 Briar Cliff RdJul 1, 2025Nsfaa-duplex-1534/1536 briar cliff rd · 275 m away
- 1627 Briar Cliff RdJan 7, 2026Releasing gas meter · 279 m away
- 1524 Briar Cliff RdDec 18, 2025Upgrade elec service to 200 amps service · 285 m away