650 Regal Row
Dallas, TX 75247
Permit to replace two backflow devices at 650 Regal Row
A City of Dallas commercial plumbing permit indicates that two backflow devices are being replaced at 650 Regal Row. The permit was filed on May 12, 2025, under permit number COM-PLM-25-000031.
Summarized from City of Dallas records · updated May 12, 2025
- Projects
- 7
- 7 filings
- Latest filing
- May 12, 2025
- since May 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsSources: City of Dallas
Questions about 650 Regal Row
What work was permitted at 650 Regal Row?
A City of Dallas commercial plumbing permit covers replacement of two backflow devices. It was filed May 12, 2025.
Is a new building being built at 650 Regal Row?
The available permit record describes replacement of two backflow devices; it does not document a new building.
When was the plumbing permit filed for 650 Regal Row?
The permit was filed on May 12, 2025.
What is the permit number for work at 650 Regal Row?
The permit number is COM-PLM-25-000031. It covers replacing two backflow devices.
Is a new business opening at 650 Regal Row?
The available City of Dallas record documents plumbing work to replace two backflow devices, not a business opening.
Also being built nearby
All of 75247- 737 Regal RowNov 18, 2020Sewer relay · 192 m away
- 510 Regal RowMay 26, 2026Replace existing building sewer · 203 m away
- 535 Regal RowMar 17, 2026Cleanouts, spot repair in wall · 223 m away
- 9239 Premier RowMar 17, 2026Commercial roof recover. install new 60-mil mule hide tpo single-ply roofing system over the existing flat roof assembly. work includes installation of new pipe flashings and a/c pitch pockets at all roof penetrations and integration with the new membrane system. no structural modifications are included in this scope of work. installation will be completed in accordance with manufacturer specifications and applicable city of dallas building codes. existing roof layers will remain within code-allowed limits · 240 m away
- 9130 Premier Row · Solkorp LLCApr 15, 2026Install 2 walk in coolers and a blast freezer for food storage · 269 m away
- 750 Regal RowAug 15, 2025Check all plumbing up to code · 286 m away
- 740 Regal RowJul 22, 2025Qteam qr demolition one sheetrock demising wall. the wall is approximately 176 linear feet and approximately 18 feet high. the wall that is being demolished does not include any electrical, plumbing, or mechanical · 305 m away
- 433 Regal RowSep 17, 2026Replacing 60 ft of 4” pvc sewer line in front parking lot and 40 ft of 4 inch pvc drain line from the roof to the front parking lot. will use a mini ex and backhoe during repair process for backfilling and digging · 313 m away
- 9019 Premier RowOct 22, 2026Installed 135 feet of 1 1/4 black iron to bypass the section of piping that was leaking. tied into the 1 1/4 feed and ran all new clevis hangers on beam clamps every five feet feeding two hanging heaters on a new 3/4 feed line to heaters · 355 m away
- 9200 Chancellor RowDec 18, 2020Gas relay or repair with test · 368 m away
- 9029 Directors RowAug 18, 2026Remove existing wet or damaged concrete during membrane removal and fill voids with new material to match existingcut and remove the existing membrane and dispose of off-site. existing concrete decking will be removed as determined to be deficient during membrane removal. install new 60 mil fleeceback tpo membrane roofing system, fully adhered to concrete deck with low-rise adhesive or manufacturer requirements.remove flashing and seals around roof penetrations entirely and replace with new penetration seals remove existing termination bars and counter flashings. install new termination bars at base of wall flashingsremove all waterproofing membrane wall flashings along perimeter walls. remove and replace metal coping cap flashings or edge terminations and associated flashings (including existing cleats). inspect and replace wood blocking identified to be deficient. provide new waterproofing membrane flashings, fully adhered to wall, and wrap over the exterior side of the wood nailer, 1”-2” below the bottom edge. provide new parapet metal terminationsexisting membrane flashings at all roof to wall transitions, equipment curbs, smoke hatches, skylights, etc. completely removed. inspect insulation and seals and replace as required. clean existing membrane surfaces and adhere new tpo base flashings.edge metal will be removed entirely and replaced with new tpo clad edge metal, fastenedremove existing gutter, downspouts, gravel stop/edge metal, and accessories. provide new gutter, downspouts, edge metal and accessoriesremove existing scuppers and face plates. provide new tpo-clad metal scuppers and face plates to match existing, install new tpo flashings, heat welded to scupperremove downspouts and leaders. provide new downspouts and leaders to match existing. provide new prefinished or paint to match existing · 442 m away
- 320 Regal RowFeb 4, 2026Request a clean and show permit to allow authorized contractors/agents to access the vacant space to clean, remove debris, and prepare the unit for showings (no construction or tenant improvements) · 459 m away