9029 Directors Row
Dallas, TX 75247
Roof replacement permitted at 9029 Directors Row
A commercial roofing permit filed August 18, 2026, covers replacing the roof membrane at 9029 Directors Row with a fully adhered 60-mil fleeceback TPO system. The work includes replacing flashing, edge metal, gutters, downspouts and scuppers, and repairing deficient concrete or wood blocking as needed.
Summarized from City of Dallas records · updated Aug 18, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Aug 18, 2026
- since Aug 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsRemove existing wet or damaged concrete during membrane removal and fill voids with new material to match existingcut and remove the existing membrane and dispose of off-site. existing concrete decking will be removed as determined to be deficient during membrane removal. install new 60 mil fleeceback tpo membrane roofing system, fully adhered to concrete deck with low-rise adhesive or manufacturer requirements.remove flashing and seals around roof penetrations entirely and replace with new penetration seals remove existing termination bars and counter flashings. install new termination bars at base of wall flashingsremove all waterproofing membrane wall flashings along perimeter walls. remove and replace metal coping cap flashings or edge terminations and associated flashings (including existing cleats). inspect and replace wood blocking identified to be deficient. provide new waterproofing membrane flashings, fully adhered to wall, and wrap over the exterior side of the wood nailer, 1”-2” below the bottom edge. provide new parapet metal terminationsexisting membrane flashings at all roof to wall transitions, equipment curbs, smoke hatches, skylights, etc. completely removed. inspect insulation and seals and replace as required. clean existing membrane surfaces and adhere new tpo base flashings.edge metal will be removed entirely and replaced with new tpo clad edge metal, fastenedremove existing gutter, downspouts, gravel stop/edge metal, and accessories. provide new gutter, downspouts, edge metal and accessoriesremove existing scuppers and face plates. provide new tpo-clad metal scuppers and face plates to match existing, install new tpo flashings, heat welded to scupperremove downspouts and leaders. provide new downspouts and leaders to match existing. provide new prefinished or paint to match existing
Remove existing wet or damaged concrete during membrane removal and fill voids with new material to match existingcut and remove the existing membrane and dispose of off-site. existing concrete decking will be removed as determined to be deficient during membrane removal. install new 60 mil fleeceback tpo membrane roofing system, fully adhered to concrete deck with low-rise adhesive or manufacturer requirements.remove flashing and seals around roof penetrations entirely and replace with new penetration seals remove existing termination bars and counter flashings. install new termination bars at base of wall flashingsremove all waterproofing membrane wall flashings along perimeter walls. remove and replace metal coping cap flashings or edge terminations and associated flashings (including existing cleats). inspect and replace wood blocking identified to be deficient. provide new waterproofing membrane flashings, fully adhered to wall, and wrap over the exterior side of the wood nailer, 1”-2” below the bottom edge. provide new parapet metal terminationsexisting membrane flashings at all roof to wall transitions, equipment curbs, smoke hatches, skylights, etc. completely removed. inspect insulation and seals and replace as required. clean existing membrane surfaces and adhere new tpo base flashings.edge metal will be removed entirely and replaced with new tpo clad edge metal, fastenedremove existing gutter, downspouts, gravel stop/edge metal, and accessories. provide new gutter, downspouts, edge metal and accessoriesremove existing scuppers and face plates. provide new tpo-clad metal scuppers and face plates to match existing, install new tpo flashings, heat welded to scupperremove downspouts and leaders. provide new downspouts and leaders to match existing. provide new prefinished or paint to match existing
City of Dallas permitCommercial Roofing Permit
Sources: City of Dallas
Questions about 9029 Directors Row
What work is permitted at 9029 Directors Row?
A commercial roofing permit covers removing the existing membrane and installing a new 60-mil fleeceback TPO roofing system. The permit was filed August 18, 2026.
When was the roof replacement permit filed?
The City of Dallas permit was filed August 18, 2026. Its number is COM-ROOF-26-000214.
What kind of roofing system is planned at 9029 Directors Row?
The permit specifies a fully adhered 60-mil fleeceback TPO membrane roofing system installed over the concrete deck.
Will the work include replacing roof flashing at 9029 Directors Row?
Yes. The permit describes removing and replacing roof-to-wall and penetration flashings, along with termination bars and coping or edge terminations.
Will gutters and downspouts be replaced at 9029 Directors Row?
The permit includes removing and replacing the gutters, downspouts, edge metal and accessories. It also calls for new TPO-clad scuppers and face plates.
Also being built nearby
All of 75247- 8939 Directors RowOct 21, 2026Global gourmet foods, installation of a new indoor w-i freezer · 168 m away
- 8901 Directors RowApr 17, 2026No work electrical inspection · 239 m away
- 9012 Chancellor RowMar 27, 2026Route to floo. installing 28 steel reinforced solid concrete bell bottom piers, 17 across the front of the building and 6 on each side. for raising and stabilizing foundation · 255 m away
- 8816 Directors RowNov 10, 2025Gas pressure test to restore service with atmos · 315 m away
- 750 Regal RowAug 15, 2025Check all plumbing up to code · 368 m away
- 8925 Premier RowApr 29, 2026Excavation for sewer line replacement, 10ft · 382 m away
- 9019 Premier RowOct 22, 2026Installed 135 feet of 1 1/4 black iron to bypass the section of piping that was leaking. tied into the 1 1/4 feed and ran all new clevis hangers on beam clamps every five feet feeding two hanging heaters on a new 3/4 feed line to heaters · 385 m away
- 9101 Sovereign RowNov 2, 2020Upgrade existing electrical service · 403 m away
- 8900 Premier RowMar 12, 2026Mcr no work. was told to take out a remodel permit and attach it to co-26-000557 · 403 m away
- 9009 Sovereign RowOct 9, 2025Update to reflect new interior wall with no electrical or plumbing in the 2nd floor to create a locker room and to divide the room into 2 sections. mobile kitchen is not included in this project · 405 m away
- 9112 Sovereign RowJun 23, 2025Replaced damaged conduit and wiring due to vandals. need release to oncor for power restoration · 419 m away
- 9000 Sovereign RowJun 1, 2026Trencing to make repairs to the water service line in the yard · 420 m away