9012 Chancellor Row
Dallas, TX 75247
Foundation repair permitted at 9012 Chancellor Row
A commercial foundation repair was permitted at 9012 Chancellor Row on March 27, 2026. Permit COM-FDN-26-000020 describes installing 28 steel-reinforced concrete piers to raise and stabilize the foundation.
Summarized from City of Dallas records · updated Mar 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 27, 2026
- since Mar 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRoute to floo. installing 28 steel reinforced solid concrete bell bottom piers, 17 across the front of the building and 6 on each side. for raising and stabilizing foundation
Route to floo. installing 28 steel reinforced solid concrete bell bottom piers, 17 across the front of the building and 6 on each side. for raising and stabilizing foundation
City of Dallas permitCommercial Foundation Repair
Sources: City of Dallas
Questions about 9012 Chancellor Row
What is happening at 9012 Chancellor Row?
A City of Dallas permit indicates commercial foundation repair, including installation of 28 steel-reinforced concrete piers. The permit was filed March 27, 2026.
What are they building at 9012 Chancellor Row?
The permit describes foundation work rather than a new building: 28 bell-bottom concrete piers to raise and stabilize the foundation.
When was the foundation repair permitted at 9012 Chancellor Row?
The City of Dallas permit was filed on March 27, 2026. Its permit number is COM-FDN-26-000020.
How many foundation piers are planned at 9012 Chancellor Row?
The permit calls for 28 steel-reinforced solid concrete bell-bottom piers: 17 across the front and six on each side.
What's happening near Sovereign Row Addition?
A commercial foundation repair was permitted at 9012 Chancellor Row, about 279 meters from Sovereign Row Addition at 8900 Sovereign Row. The filing describes installing 28 concrete piers to raise and stabilize the foundation.
Also being built nearby
All of 75247- 9009 Sovereign RowOct 9, 2025Update to reflect new interior wall with no electrical or plumbing in the 2nd floor to create a locker room and to divide the room into 2 sections. mobile kitchen is not included in this project · 159 m away
- 9101 Sovereign RowNov 2, 2020Upgrade existing electrical service · 160 m away
- 9000 Sovereign RowJun 1, 2026Trencing to make repairs to the water service line in the yard · 176 m away
- 9112 Sovereign RowJun 23, 2025Replaced damaged conduit and wiring due to vandals. need release to oncor for power restoration · 179 m away
- 9029 Directors RowAug 18, 2026Remove existing wet or damaged concrete during membrane removal and fill voids with new material to match existingcut and remove the existing membrane and dispose of off-site. existing concrete decking will be removed as determined to be deficient during membrane removal. install new 60 mil fleeceback tpo membrane roofing system, fully adhered to concrete deck with low-rise adhesive or manufacturer requirements.remove flashing and seals around roof penetrations entirely and replace with new penetration seals remove existing termination bars and counter flashings. install new termination bars at base of wall flashingsremove all waterproofing membrane wall flashings along perimeter walls. remove and replace metal coping cap flashings or edge terminations and associated flashings (including existing cleats). inspect and replace wood blocking identified to be deficient. provide new waterproofing membrane flashings, fully adhered to wall, and wrap over the exterior side of the wood nailer, 1”-2” below the bottom edge. provide new parapet metal terminationsexisting membrane flashings at all roof to wall transitions, equipment curbs, smoke hatches, skylights, etc. completely removed. inspect insulation and seals and replace as required. clean existing membrane surfaces and adhere new tpo base flashings.edge metal will be removed entirely and replaced with new tpo clad edge metal, fastenedremove existing gutter, downspouts, gravel stop/edge metal, and accessories. provide new gutter, downspouts, edge metal and accessoriesremove existing scuppers and face plates. provide new tpo-clad metal scuppers and face plates to match existing, install new tpo flashings, heat welded to scupperremove downspouts and leaders. provide new downspouts and leaders to match existing. provide new prefinished or paint to match existing · 255 m away
- 8908 Sovereign RowFeb 10, 202622 x 59 steel carport free standing steel carport post in concrete · 269 m away
- 9207 Sovereign RowMay 15, 2026100' sewer and water line replacement. 50' under building tunnel, 50' outside to city · 272 m away
- 8900 Sovereign Row · Bf & Jf, LLCNov 9, 2026Additional 20ft x 138ftfor the building · 279 m away
- 9213 Sovereign RowJul 25, 2025Replace main service & 2 sub-panels · 279 m away
- 9210 Sovereign RowMar 25, 2026Mechanically fasten one layer of 1” of iso to the existing deck. mechanically fasten 1 ply of white 60 mil tpo membrane. *no structrual changes*building is occupied · 284 m away
- 8939 Directors RowOct 21, 2026Global gourmet foods, installation of a new indoor w-i freezer · 301 m away
- 8901 Directors RowApr 17, 2026No work electrical inspection · 345 m away