9009 Sovereign Row
Dallas, TX 75247
Permit calls for second-floor locker room at 9009 Sovereign Row
A Dallas commercial alteration permit filed Oct. 9, 2025, calls for a new interior wall on the second floor at 9009 Sovereign Row to create a locker room and divide the room into two sections. The permit says the work includes no electrical or plumbing and excludes a mobile kitchen.
Summarized from City of Dallas records · updated Oct 9, 2025
- Projects
- 8
- 8 filings
- Latest filing
- Oct 9, 2025
- since Oct 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
8 projectsUpdate to reflect new interior wall with no electrical or plumbing in the 2nd floor to create a locker room and to divide the room into 2 sections. mobile kitchen is not included in this project
Update to reflect new interior wall with no electrical or plumbing in the 2nd floor to create a locker room and to divide the room into 2 sections. mobile kitchen is not included in this project
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 9009 Sovereign Row
What is being built at 9009 Sovereign Row?
A new second-floor interior wall is planned to create a locker room and divide the room into two sections. The work is described in Dallas permit COM-ALT-ADD-25-000225.
When was the permit filed for 9009 Sovereign Row?
The commercial alteration permit was filed on Oct. 9, 2025.
Is a mobile kitchen included in the 9009 Sovereign Row project?
No. The permit description specifically says the mobile kitchen is not included in this project.
Does the work at 9009 Sovereign Row include electrical or plumbing?
The permit description says the new interior wall work has no electrical or plumbing.
What work is planned near Sovereign Row Addition?
At 9009 Sovereign Row, the permit calls for a second-floor interior wall to create a locker room and split a room into two sections. Sovereign Row Addition is listed nearby at 8900 Sovereign Row.
Also being built nearby
All of 75247- 9000 Sovereign RowJun 1, 2026Trencing to make repairs to the water service line in the yard · 18 m away
- 9101 Sovereign RowNov 2, 2020Upgrade existing electrical service · 139 m away
- 8908 Sovereign RowFeb 10, 202622 x 59 steel carport free standing steel carport post in concrete · 152 m away
- 9112 Sovereign RowJun 23, 2025Replaced damaged conduit and wiring due to vandals. need release to oncor for power restoration · 158 m away
- 9012 Chancellor RowMar 27, 2026Route to floo. installing 28 steel reinforced solid concrete bell bottom piers, 17 across the front of the building and 6 on each side. for raising and stabilizing foundation · 159 m away
- 8900 Sovereign Row · Bf & Jf, LLCNov 9, 2026Additional 20ft x 138ftfor the building · 164 m away
- 8804 Sovereign RowDec 9, 2025Gas repair with test · 248 m away
- 9207 Sovereign RowMay 15, 2026100' sewer and water line replacement. 50' under building tunnel, 50' outside to city · 299 m away
- 9210 Sovereign RowMar 25, 2026Mechanically fasten one layer of 1” of iso to the existing deck. mechanically fasten 1 ply of white 60 mil tpo membrane. *no structrual changes*building is occupied · 306 m away
- 9213 Sovereign RowJul 25, 2025Replace main service & 2 sub-panels · 308 m away
- 8720 Sovereign RowNov 9, 2020Remove add/remove equipment existing structure. no change mw eqip · 312 m away
- 8700 Chancellor RowDec 22, 2020Remove existing commercial dr and replace with wider driveway · 357 m away
More restaurants in 75247.