No-work electrical inspection filed at 8901 Directors Row
A City of Dallas commercial electrical permit record describes a no-work electrical inspection at 8901 Directors Row. It was filed on April 17, 2026, under permit COM-ELC-26-001683; the record does not describe new construction or other work.
Summarized from City of Dallas records · updated Apr 17, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 17, 2026
- since Apr 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8901 Directors Row
What is being built at 8901 Directors Row?
The April 17, 2026, City of Dallas permit record is for a no-work electrical inspection, not a described building project. It does not identify new construction.
What does permit COM-ELC-26-001683 cover?
The commercial electrical permit describes a no-work electrical inspection at 8901 Directors Row. It was filed on April 17, 2026.
When was the electrical permit filed at 8901 Directors Row?
The City of Dallas record shows a filing date of April 17, 2026, for permit COM-ELC-26-001683.
Is construction planned at 8901 Directors Row?
The available record describes only a no-work electrical inspection. It does not specify construction plans.
What is happening near Sovereign Row Addition?
At 8901 Directors Row, about 411 meters from Sovereign Row Addition, a City of Dallas permit was filed for a no-work electrical inspection on April 17, 2026.
Also being built nearby
All of 75247- 8939 Directors RowOct 21, 2026Global gourmet foods, installation of a new indoor w-i freezer · 71 m away
- 8816 Directors RowNov 10, 2025Gas pressure test to restore service with atmos · 76 m away
- 8615 Directors RowSep 8, 2025No work done, meter release · 229 m away
- 9029 Directors RowAug 18, 2026Remove existing wet or damaged concrete during membrane removal and fill voids with new material to match existingcut and remove the existing membrane and dispose of off-site. existing concrete decking will be removed as determined to be deficient during membrane removal. install new 60 mil fleeceback tpo membrane roofing system, fully adhered to concrete deck with low-rise adhesive or manufacturer requirements.remove flashing and seals around roof penetrations entirely and replace with new penetration seals remove existing termination bars and counter flashings. install new termination bars at base of wall flashingsremove all waterproofing membrane wall flashings along perimeter walls. remove and replace metal coping cap flashings or edge terminations and associated flashings (including existing cleats). inspect and replace wood blocking identified to be deficient. provide new waterproofing membrane flashings, fully adhered to wall, and wrap over the exterior side of the wood nailer, 1”-2” below the bottom edge. provide new parapet metal terminationsexisting membrane flashings at all roof to wall transitions, equipment curbs, smoke hatches, skylights, etc. completely removed. inspect insulation and seals and replace as required. clean existing membrane surfaces and adhere new tpo base flashings.edge metal will be removed entirely and replaced with new tpo clad edge metal, fastenedremove existing gutter, downspouts, gravel stop/edge metal, and accessories. provide new gutter, downspouts, edge metal and accessoriesremove existing scuppers and face plates. provide new tpo-clad metal scuppers and face plates to match existing, install new tpo flashings, heat welded to scupperremove downspouts and leaders. provide new downspouts and leaders to match existing. provide new prefinished or paint to match existing · 239 m away
- 8700 Chancellor RowDec 22, 2020Remove existing commercial dr and replace with wider driveway · 303 m away
- 8517 Directors RowMar 2, 2026Re-roof: install 1/2" eps fanfold insulation and.60mil tpo - single ply membrane over existing built-up roof (1 layer). no tear off, overlay only. no change to pitch · 304 m away
- 8516 Directors RowSep 9, 2026Replace 5 ton condenser and coil · 304 m away
- 8900 Premier RowMar 12, 2026Mcr no work. was told to take out a remodel permit and attach it to co-26-000557 · 325 m away
- 9012 Chancellor RowMar 27, 2026Route to floo. installing 28 steel reinforced solid concrete bell bottom piers, 17 across the front of the building and 6 on each side. for raising and stabilizing foundation · 345 m away
- 8925 Premier RowApr 29, 2026Excavation for sewer line replacement, 10ft · 358 m away
- 8401 Chancellor RowNov 17, 2026Mudjack · 364 m away
- 8435 Directors RowFeb 26, 2026Roof mounted solar installation · 366 m away