8816 Directors Row
Dallas, TX 75247
Gas pressure test filed at 8816 Directors Row
A commercial plumbing permit at 8816 Directors Row covers a gas pressure test to restore service. The City of Dallas record was filed November 10, 2025, under permit COM-PLM-25-002466.
Summarized from City of Dallas records · updated Nov 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 10, 2025
- since Nov 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8816 Directors Row
What is happening at 8816 Directors Row in Dallas?
A City of Dallas commercial plumbing permit covers a gas pressure test to restore service. The permit was filed November 10, 2025.
Is a new building being constructed at 8816 Directors Row?
The available permit record describes a gas pressure test to restore service, not new building construction.
When was the permit filed for 8816 Directors Row?
The permit was filed November 10, 2025. Its number is COM-PLM-25-002466.
What kind of permit was issued for 8816 Directors Row?
The City of Dallas record lists a commercial plumbing permit for a gas pressure test to restore service.
What is happening near Sovereign Row Addition in Dallas?
At 8816 Directors Row, about 406 meters from Sovereign Row Addition, a permit covers a gas pressure test to restore service. It was filed November 10, 2025.
Also being built nearby
All of 75247- 8901 Directors RowApr 17, 2026No work electrical inspection · 76 m away
- 8939 Directors RowOct 21, 2026Global gourmet foods, installation of a new indoor w-i freezer · 147 m away
- 8615 Directors RowSep 8, 2025No work done, meter release · 154 m away
- 8516 Directors RowSep 9, 2026Replace 5 ton condenser and coil · 229 m away
- 8517 Directors RowMar 2, 2026Re-roof: install 1/2" eps fanfold insulation and.60mil tpo - single ply membrane over existing built-up roof (1 layer). no tear off, overlay only. no change to pitch · 229 m away
- 8700 Chancellor RowDec 22, 2020Remove existing commercial dr and replace with wider driveway · 258 m away
- 8401 Chancellor RowNov 17, 2026Mudjack · 289 m away
- 8435 Directors RowFeb 26, 2026Roof mounted solar installation · 291 m away
- 9029 Directors RowAug 18, 2026Remove existing wet or damaged concrete during membrane removal and fill voids with new material to match existingcut and remove the existing membrane and dispose of off-site. existing concrete decking will be removed as determined to be deficient during membrane removal. install new 60 mil fleeceback tpo membrane roofing system, fully adhered to concrete deck with low-rise adhesive or manufacturer requirements.remove flashing and seals around roof penetrations entirely and replace with new penetration seals remove existing termination bars and counter flashings. install new termination bars at base of wall flashingsremove all waterproofing membrane wall flashings along perimeter walls. remove and replace metal coping cap flashings or edge terminations and associated flashings (including existing cleats). inspect and replace wood blocking identified to be deficient. provide new waterproofing membrane flashings, fully adhered to wall, and wrap over the exterior side of the wood nailer, 1”-2” below the bottom edge. provide new parapet metal terminationsexisting membrane flashings at all roof to wall transitions, equipment curbs, smoke hatches, skylights, etc. completely removed. inspect insulation and seals and replace as required. clean existing membrane surfaces and adhere new tpo base flashings.edge metal will be removed entirely and replaced with new tpo clad edge metal, fastenedremove existing gutter, downspouts, gravel stop/edge metal, and accessories. provide new gutter, downspouts, edge metal and accessoriesremove existing scuppers and face plates. provide new tpo-clad metal scuppers and face plates to match existing, install new tpo flashings, heat welded to scupperremove downspouts and leaders. provide new downspouts and leaders to match existing. provide new prefinished or paint to match existing · 315 m away
- 8400 Directors RowDec 4, 2025Gas test · 317 m away
- 8504 Chancellor RowSep 9, 2026Hvac change out – remove & replace 1 full system. rooftop condenser. drop ceiling furnace installation · 338 m away
- 8900 Premier RowMar 12, 2026Mcr no work. was told to take out a remodel permit and attach it to co-26-000557 · 347 m away