8900 Premier Row
Dallas, TX 75247
Dallas record says a remodel permit is still needed
A City of Dallas commercial alteration/addition record for 8900 Premier Row, filed March 12, 2026, says no work was performed. It instructs the applicant to obtain a remodel permit and attach it to permit CO-26-000557; the record does not describe the planned work.
Summarized from City of Dallas records · updated Mar 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 12, 2026
- since Mar 12, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8900 Premier Row
What is being built at 8900 Premier Row?
The March 12, 2026, City of Dallas record does not say what is being built. It says no work was performed and a remodel permit was needed.
What does the permit record for 8900 Premier Row say?
Record COM-ALT-ADD-26-000495 says no work was performed and instructs the applicant to obtain a remodel permit and attach it to CO-26-000557.
When was the 8900 Premier Row permit filed?
The City of Dallas record was filed March 12, 2026.
Has work started at 8900 Premier Row?
The record says no work was performed. It does not provide an update on work after March 12, 2026.
What is permit COM-ALT-ADD-26-000495 for?
It is a City of Dallas commercial alteration/addition permit record. Its description says a remodel permit should be obtained and attached to CO-26-000557.
Does the record say what the remodel will cost?
No project cost is listed in the provided record.
Also being built nearby
All of 75247- 8925 Premier RowApr 29, 2026Excavation for sewer line replacement, 10ft · 83 m away
- 8901 Directors RowApr 17, 2026No work electrical inspection · 325 m away
- 8939 Directors RowOct 21, 2026Global gourmet foods, installation of a new indoor w-i freezer · 333 m away
- 8816 Directors RowNov 10, 2025Gas pressure test to restore service with atmos · 347 m away
- 9030 Viscount RowJan 13, 2021Install new plumbing · 359 m away
- 8615 Directors RowSep 8, 2025No work done, meter release · 399 m away
- 9019 Premier RowOct 22, 2026Installed 135 feet of 1 1/4 black iron to bypass the section of piping that was leaking. tied into the 1 1/4 feed and ran all new clevis hangers on beam clamps every five feet feeding two hanging heaters on a new 3/4 feed line to heaters · 402 m away
- 9029 Directors RowAug 18, 2026Remove existing wet or damaged concrete during membrane removal and fill voids with new material to match existingcut and remove the existing membrane and dispose of off-site. existing concrete decking will be removed as determined to be deficient during membrane removal. install new 60 mil fleeceback tpo membrane roofing system, fully adhered to concrete deck with low-rise adhesive or manufacturer requirements.remove flashing and seals around roof penetrations entirely and replace with new penetration seals remove existing termination bars and counter flashings. install new termination bars at base of wall flashingsremove all waterproofing membrane wall flashings along perimeter walls. remove and replace metal coping cap flashings or edge terminations and associated flashings (including existing cleats). inspect and replace wood blocking identified to be deficient. provide new waterproofing membrane flashings, fully adhered to wall, and wrap over the exterior side of the wood nailer, 1”-2” below the bottom edge. provide new parapet metal terminationsexisting membrane flashings at all roof to wall transitions, equipment curbs, smoke hatches, skylights, etc. completely removed. inspect insulation and seals and replace as required. clean existing membrane surfaces and adhere new tpo base flashings.edge metal will be removed entirely and replaced with new tpo clad edge metal, fastenedremove existing gutter, downspouts, gravel stop/edge metal, and accessories. provide new gutter, downspouts, edge metal and accessoriesremove existing scuppers and face plates. provide new tpo-clad metal scuppers and face plates to match existing, install new tpo flashings, heat welded to scupperremove downspouts and leaders. provide new downspouts and leaders to match existing. provide new prefinished or paint to match existing · 403 m away
- 9112 Viscount RowJan 30, 2026Gas test for release · 446 m away
- 8517 Directors RowMar 2, 2026Re-roof: install 1/2" eps fanfold insulation and.60mil tpo - single ply membrane over existing built-up roof (1 layer). no tear off, overlay only. no change to pitch · 446 m away
- 8516 Directors RowSep 9, 2026Replace 5 ton condenser and coil · 456 m away
- 5101 Norwood RdNov 10, 2025Mcr the warehouse has an office space inside, the ceiling to this office space is a false ceiling since it does not reach the warehouse ceiling. i want to raise this "false ceiling" from 8ft up to 12ft · 466 m away